Documents/Reports – Pre-Settlement
Note: Some reports, although portioned into manageable sizes are still quite large and may take some time to download – depending on your download speed.
Expert Reports
Federal Supplemental- 0_Chapter 0 Cover And TOC (0 B)
- 10_Chapter 10 Land Use And Ownership (0 B)
- 11_Chapter 11 Social And Cultural Factors (0 B)
- 12_Chapter 12 Other Programs Downstream Opportunities And Constraints (0 B)
- 1_Chapter 1 Introduction (0 B)
- 2_Chapter 2 Surface Water Hydrology (0 B)
- 3_Chapter 3 Fluvial Process And Channel Form (0 B)
- 4_Chapter 4 Shallow Groundwater Hydrology (0 B)
- 5_Chapter 5 Water Related Infrastructure And Human Channel Modification (0 B)
- 6_Chapter 6 Water Quality (0 B)
- 7_Chapter 7 Fish Resources (0 B)
- 8_Chapter 8 Vegetation (0 B)
- 9_Chapter 9 Special Status Plants And Wildlife (0 B)
- Appendix-A (0 B)
- Appendix-B (0 B)
- Appendix-C (0 B)
- Appendix-D (0 B)
- 10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (2.8 MiB)
- 2010 10 06 AgencyPlan PublicCommentForm (17 KiB)
- 2010 Annual Technical Report - Appendix A (0.8 MiB)
- 2010 Annual Technical Report - Appendix B Reports (0.5 MiB)
- 2010 Annual Technical Report Public Draft (1.2 MiB)
- 2012-2013 Fish Actions (0.1 MiB)
- 2012-2013 Fish Actions Final (0.1 MiB)
- 201208 Part III Guidelines Financial Assistance for Local Projects (1.6 MiB)
- 2014 Restoration Allocation and Default Flow Schedule (0.4 MiB)
- 2015 Restoration Year Channel Capacity Report (3.4 MiB)
- 2015 Revised Framework for Implementation (1.4 MiB)
- 2015 Water Management Goal Investment Strategy Final Report (4.1 MiB)
- 2017 & 2018 SJRRP Annual Report (0 B)
- 2020 Channel Capacity Report (0 B)
- 2022 Channel Capacity Report Final 1 (0 B)
- 2023 Channel Capacity Report (0 B)
- 2025 Draft Channel Capacity Report (0 B)
- Addendum to Public Involvement Plan Environmental Justice (18 KiB)
- Agency Plan Public Comment Form (10 KiB)
- Annual Technical Report - Appendix A (0.8 MiB)
- Appendix A (7.3 MiB)
- Appendix A CCR 2022 1 (0 B)
- Appendix A PEIS/R Text Related to Channel Capacity (0 B)
- Appendix A Program Accomplishments Final 22015 Framework for Implementation (0.6 MiB)
- Appendix B 2020 Levee Capacity Update in the Middle Eastside Bypass (0 B)
- Appendix B 2022 CCR 1 (0 B)
- Appendix C 2022 CCR 1 (0 B)
- Appendix C Bank Erosion Monitoring Report (0 B)
- Appraisal Report AppC SJRRP Cons Facility Water Supply (11.4 MiB)
- Appraisal Report Appendix B SJRRP Cons Facility Water Supply (4.0 MiB)
- Appraisal Report Cons Facility Water Supply (0.5 MiB)
- Appraisal Study Report: Cons Facility Water Supply (22.3 MiB)
- Aug 21 US FWS BO (6.5 MiB)
- CCAG Report Appendix A - 2014 Accessible (0.1 MiB)
- CCAG Report Appendix B 01132015 Accessible (1.4 MiB)
- CCR2017 Final-draft Appendix-A 508 (0.2 MiB)
- CCR2017 Final-draft Appendix-C 508 (2.2 MiB)
- CCR2017 Final-draft Appendix-D 508 (3.6 MiB)
- Channel Capacity Report (0 B)
- Channel Capacity Report (0 B)
- Channel Capacity Report - Appendix A (89 KiB)
- Channel Capacity Report - Appendix A (0.2 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix B (0.4 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix C (1.3 MiB)
- Channel Capacity Report - Appendix C (1.2 MiB)
- Channel Capacity Report - Appendix C (14.5 MiB)
- Channel Capacity Report - Appendix D (4.9 MiB)
- Channel Capacity Report - Appendix D (3.3 MiB)
- Channel Capacity Report - Appendix D (1.8 MiB)
- Channel Capacity Report - Appendix E (3.7 MiB)
- Channel Capacity Report - Appendix E (3.0 MiB)
- Channel Capacity Report - Appendix E (5.0 MiB)
- Channel Capacity Report - Appendix F (0.9 MiB)
- Channel Capacity Report - Appendix F (3.9 MiB)
- Channel Capacity Report - Appendix G (2.7 MiB)
- Channel Capacity Report - Appendix H (0.3 MiB)
- Channel Capacity Report 2014 Restoration Year (1.2 MiB)
- Channel Capacity Report 2016 Appendix A (0 B)
- Channel Capacity Report 2016 Appendix B (0 B)
- Channel Capacity Report 2016 Appendix C (0 B)
- Channel Capacity Report 2016 Appendix D (0 B)
- Channel Capacity Report 2016 Appendix E (0 B)
- Channel Capacity Report 2018 Final (4.4 MiB)
- Channel Capacity Report 2018 Public Draft (2.5 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix A (0.3 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix B (1.7 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix C (1.1 MiB)
- Channel Capacity Report 2022 Restoration Year (0 B)
- Channel Capacity Report 2024 1 8 24f 508 (0 B)
- Channel Capacity Report Final - 2014 Accessible (8.3 MiB)
- Channel Capacity Report Publicdraft (4.2 MiB)
- Channel-Capacity-Report 2017 Final 508 (5.2 MiB)
- Chinook Salmon Temporal Occurrence and Environmental Requirements: Preliminary Tables (0.2 MiB)
- Conceptual Models of Stressors and Limiting Factors for San Joaquin River Chinook Salmon (2.0 MiB)
- Dec 2011 FINAL §10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (1.9 MiB)
- Draft Background Report on Friant Dam Operations (1.2 MiB)
- Draft Fisheries Implementation Plan (3.3 MiB)
- Draft Purpose & Need for Action TM (58 KiB)
- Draft Regulatory Compliance Strategy TM (0.7 MiB)
- DRAFT Technical Memorandum: Alternatives Formulation Strategy (0.2 MiB)
- Evaluation of Hills Ferry Barrier Effectiveness at Restricting Chinook Salmon Passage (2.0 MiB)
- Federal Register Notice Of Intent (59 KiB)
- Final Programmatic Biological Assessment (6.2 MiB)
- Final Riparian Habitat Mapping, Monitoring, and Mitigation Plan (0.4 MiB)
- FINAL SJRRP PROGRAM MANAGEMENT PLAN (6.2 MiB)
- Financial Assistance for Local Projects - Part III Guidelines (1.6 MiB)
- Fisheries Management Plan (2.5 MiB)
- Fisheries Management Plan - Exhibit A (2.0 MiB)
- Fisheries Management Plan - Exhibit B (0.3 MiB)
- Fisheries Management Plan - Exhibit C (0.2 MiB)
- Fisheries Management Plan - Exhibit D (1.6 MiB)
- Fisheries Management Plan - Exhibit E (0.5 MiB)
- Fisheries Management Plan - Exhibit F (0.5 MiB)
- FY 13 Final AWP (1.8 MiB)
- FY 14 AWP-Final (1.9 MiB)
- FY 2015 Final Annual Work Plan (2.3 MiB)
- FY2007-2011 Approved, Obligated and Expended Funds (1.0 MiB)
- Hatchery and Genetic Management Plan (2.1 MiB)
- Hydraulic and Sediment Transport Modeling Strategy - Appendix B (1.4 MiB)
- Hydraulic Studies for Fish Habitat Analysis (3.1 MiB)
- Jan 2012 Memo FWS To Forsythe Insufficient Info For ESA (1.3 MiB)
- July 2012 Steelhead Monitoring Plan (1.1 MiB)
- May 8 US FWS Addendum(2) (1.8 MiB)
- Memorandum of Understanding between Plaintiffs and State of California (0 B)
- Middle Eastside Bypass Geotechnical Assessment - Appendix D (1.8 MiB)
- Monitoring Well Thresholds Technical Memorandum (40 KiB)
- Monitoring Well Thresholds TM (2.0 MiB)
- MOU Final As Filed (0.5 MiB)
- MP Reach2B Draft TM Data Needs Survey Approach (3.0 MiB)
- MP Reach2B Initial Options TM (2.9 MiB)
- NFMS R McInnis To Forsythe BA Consult Info Req (3.0 MiB)
- NMFS Addendum (3.1 MiB)
- Nov 2012 Minimum Floodplan Habitat Area (7.2 MiB)
- Nov 2012 PartIII Financial Assistance Update (36 KiB)
- NRDC FWUA Public Scoping Meetings Presentation (2.9 MiB)
- Oct 2012 Reach2B Project Description TM (6.2 MiB)
- Oct 3 Letter to FWS Clarification Alt C (0.9 MiB)
- Part III Guidelines for the Application of Criteria for Financial Assistance for Local Projects (2.2 MiB)
- PEIS/EIR Public Scoping Meetings Presentation (2.3 MiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (82 KiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (0.3 MiB)
- Pit 46e Final Construction Summary (0 B)
- Procedures for the Measurement, Monitoring, and Reporting of Restoration Flows (1.2 MiB)
- Public Scoping Overview Meeting Presentation (0.5 MiB)
- Public Scoping Report (0.3 MiB)
- Public Scoping Report - Appendix A (0.3 MiB)
- Public Scoping Report - Appendix C (22.8 MiB)
- Public Scoping Report And Appendices (49.4 MiB)
- Quantitative Fisheries Model Selection Recommendation Process (0.2 MiB)
- Reach 2B Technical Memorandum on Regulatory Compliance (1.3 MiB)
- Reach 4B Initial Alternatives Technical Memorandum (5.3 MiB)
- Reach 4B Public Scoping Report Addendum (7.0 MiB)
- Reach2B Analytical Tools TM (0.8 MiB)
- Reach2B Scoping Meeting Materials - Attachment B (12.8 MiB)
- Reach2B Scoping Meeting Notification - Attachment A (0.6 MiB)
- Reach2B Scoping Report (0.3 MiB)
- Reach2B Scoping Report - Attachment C (18.1 MiB)
- Reach2B Technical Memorandum on Environmental Field Survey Results (2.9 MiB)
- Restoration Flows Guidelines (5.8 MiB)
- Salmon Conservation Research Facility Permanent Flow Delivery Appraisal Study Report (12.4 MiB)
- San Joaquin River In-channel Capacity Analysis - Appendix C (14.6 MiB)
- San-Joaquin Basin Water Temperature Modeling and Analysis (2.0 MiB)
- Scoping Report Materials - Appendix B (25.0 MiB)
- Sept 2012 NMFS BO (1.5 MiB)
- SJRR Final Boards Station2 (7.8 MiB)
- SJRR Final Boards Station3 (7.3 MiB)
- SJRR Final Boards Station4 (1.0 MiB)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Draft PEISR Librarys (22 KiB)
- SJRRP Framework For Implementation Third Party Draft (1.5 MiB)
- SJRRP Initial Program Alternatives Report (1.9 MiB)
- SJRRP NOP (0.3 MiB)
- SJRRP PEISR NOD (0.6 MiB)
- SJRRP POST CARD - Scoping Meetings (66 KiB)
- SJRRP ProgramUpdate Spring2019 V7 Web (0 B)
- SJRRP Public Involvement Plan (0.3 MiB)
- SJRRP RFG V2.0 FINAL 508 (3.5 MiB)
- SJRRP Scoping Program Public Meeting Agenda (0.2 MiB)
- SJRRP Water Operations Model Work Plan TM Draft (0.2 MiB)
- SJRRP Water Quality Monitoring Plan 2010-2013 (1.5 MiB)
- SMP Draft September 2014 (0.7 MiB)
- Station 5 Reach Program Area (1.4 MiB)
- Stock Selection Strategy: Spring-Run Chinook Salmon (1.7 MiB)
- Technical Memorandum Subsidence Monitoring - Appendix E (4.0 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 (0.5 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix A (0.2 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix B (0.4 MiB)
- Temperature Model Sensitivity Analyses Sets 4 and 5 (0.7 MiB)
- Temperature Model Sensitivity Analysis Set 3 (1.1 MiB)
- Third Parties MOU (0.2 MiB)
- TM Channel Capacity Report - Appendix F (1.1 MiB)
- TM Monitoring Plan for Physical Parameters (3.2 MiB)
- TM Operation Guidelines for Implementing Restoration Flows (3.7 MiB)
- Two-Dimensional Modeling of Reach 1A (4.9 MiB)
- US FWS Addendum (1.8 MiB)