Settlement Related
Technical Feedback Group Meeting
Groundwater Report
Ra Recommendations
Program-documents
- 10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (2.8 MiB)
- 2010 10 06 AgencyPlan PublicCommentForm (17 KiB)
- 2010 Annual Technical Report - Appendix A (0.8 MiB)
- 2010 Annual Technical Report - Appendix B Reports (0.5 MiB)
- 2010 Annual Technical Report Public Draft (1.2 MiB)
- 2012-2013 Fish Actions (0.1 MiB)
- 2012-2013 Fish Actions Final (0.1 MiB)
- 201208 Part III Guidelines Financial Assistance for Local Projects (1.6 MiB)
- 2014 Restoration Allocation and Default Flow Schedule (0.4 MiB)
- 2015 Restoration Year Channel Capacity Report (3.4 MiB)
- 2015 Revised Framework for Implementation (1.4 MiB)
- 2015 Water Management Goal Investment Strategy Final Report (4.1 MiB)
- 2017 & 2018 SJRRP Annual Report (0 B)
- 2020 Channel Capacity Report (0 B)
- 2022 Channel Capacity Report Final 1 (0 B)
- 2023 Channel Capacity Report (0 B)
- 2025 Draft Channel Capacity Report (0 B)
- Addendum to Public Involvement Plan Environmental Justice (18 KiB)
- Agency Plan Public Comment Form (10 KiB)
- Annual Technical Report - Appendix A (0.8 MiB)
- Appendix A (7.3 MiB)
- Appendix A CCR 2022 1 (0 B)
- Appendix A PEIS/R Text Related to Channel Capacity (0 B)
- Appendix A Program Accomplishments Final 22015 Framework for Implementation (0.6 MiB)
- Appendix B 2020 Levee Capacity Update in the Middle Eastside Bypass (0 B)
- Appendix B 2022 CCR 1 (0 B)
- Appendix C 2022 CCR 1 (0 B)
- Appendix C Bank Erosion Monitoring Report (0 B)
- Appraisal Report AppC SJRRP Cons Facility Water Supply (11.4 MiB)
- Appraisal Report Appendix B SJRRP Cons Facility Water Supply (4.0 MiB)
- Appraisal Report Cons Facility Water Supply (0.5 MiB)
- Appraisal Study Report: Cons Facility Water Supply (22.3 MiB)
- Aug 21 US FWS BO (6.5 MiB)
- CCAG Report Appendix A - 2014 Accessible (0.1 MiB)
- CCAG Report Appendix B 01132015 Accessible (1.4 MiB)
- CCR2017 Final-draft Appendix-A 508 (0.2 MiB)
- CCR2017 Final-draft Appendix-C 508 (2.2 MiB)
- CCR2017 Final-draft Appendix-D 508 (3.6 MiB)
- Channel Capacity Report (0 B)
- Channel Capacity Report (0 B)
- Channel Capacity Report - Appendix A (89 KiB)
- Channel Capacity Report - Appendix A (0.2 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix B (0.4 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix C (1.3 MiB)
- Channel Capacity Report - Appendix C (1.2 MiB)
- Channel Capacity Report - Appendix C (14.5 MiB)
- Channel Capacity Report - Appendix D (4.9 MiB)
- Channel Capacity Report - Appendix D (3.3 MiB)
- Channel Capacity Report - Appendix D (1.8 MiB)
- Channel Capacity Report - Appendix E (3.7 MiB)
- Channel Capacity Report - Appendix E (3.0 MiB)
- Channel Capacity Report - Appendix E (5.0 MiB)
- Channel Capacity Report - Appendix F (0.9 MiB)
- Channel Capacity Report - Appendix F (3.9 MiB)
- Channel Capacity Report - Appendix G (2.7 MiB)
- Channel Capacity Report - Appendix H (0.3 MiB)
- Channel Capacity Report 2014 Restoration Year (1.2 MiB)
- Channel Capacity Report 2016 Appendix A (0 B)
- Channel Capacity Report 2016 Appendix B (0 B)
- Channel Capacity Report 2016 Appendix C (0 B)
- Channel Capacity Report 2016 Appendix D (0 B)
- Channel Capacity Report 2016 Appendix E (0 B)
- Channel Capacity Report 2018 Final (4.4 MiB)
- Channel Capacity Report 2018 Public Draft (2.5 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix A (0.3 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix B (1.7 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix C (1.1 MiB)
- Channel Capacity Report 2022 Restoration Year (0 B)
- Channel Capacity Report 2024 1 8 24f 508 (0 B)
- Channel Capacity Report Final - 2014 Accessible (8.3 MiB)
- Channel Capacity Report Publicdraft (4.2 MiB)
- Channel-Capacity-Report 2017 Final 508 (5.2 MiB)
- Chinook Salmon Temporal Occurrence and Environmental Requirements: Preliminary Tables (0.2 MiB)
- Conceptual Models of Stressors and Limiting Factors for San Joaquin River Chinook Salmon (2.0 MiB)
- Dec 2011 FINAL §10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (1.9 MiB)
- Draft Background Report on Friant Dam Operations (1.2 MiB)
- Draft Fisheries Implementation Plan (3.3 MiB)
- Draft Purpose & Need for Action TM (58 KiB)
- Draft Regulatory Compliance Strategy TM (0.7 MiB)
- DRAFT Technical Memorandum: Alternatives Formulation Strategy (0.2 MiB)
- Evaluation of Hills Ferry Barrier Effectiveness at Restricting Chinook Salmon Passage (2.0 MiB)
- Federal Register Notice Of Intent (59 KiB)
- Final Programmatic Biological Assessment (6.2 MiB)
- Final Riparian Habitat Mapping, Monitoring, and Mitigation Plan (0.4 MiB)
- FINAL SJRRP PROGRAM MANAGEMENT PLAN (6.2 MiB)
- Financial Assistance for Local Projects - Part III Guidelines (1.6 MiB)
- Fisheries Management Plan (2.5 MiB)
- Fisheries Management Plan - Exhibit A (2.0 MiB)
- Fisheries Management Plan - Exhibit B (0.3 MiB)
- Fisheries Management Plan - Exhibit C (0.2 MiB)
- Fisheries Management Plan - Exhibit D (1.6 MiB)
- Fisheries Management Plan - Exhibit E (0.5 MiB)
- Fisheries Management Plan - Exhibit F (0.5 MiB)
- FY 13 Final AWP (1.8 MiB)
- FY 14 AWP-Final (1.9 MiB)
- FY 2015 Final Annual Work Plan (2.3 MiB)
- FY2007-2011 Approved, Obligated and Expended Funds (1.0 MiB)
- Hatchery and Genetic Management Plan (2.1 MiB)
- Hydraulic and Sediment Transport Modeling Strategy - Appendix B (1.4 MiB)
- Hydraulic Studies for Fish Habitat Analysis (3.1 MiB)
- Jan 2012 Memo FWS To Forsythe Insufficient Info For ESA (1.3 MiB)
- July 2012 Steelhead Monitoring Plan (1.1 MiB)
- May 8 US FWS Addendum(2) (1.8 MiB)
- Memorandum of Understanding between Plaintiffs and State of California (0 B)
- Middle Eastside Bypass Geotechnical Assessment - Appendix D (1.8 MiB)
- Monitoring Well Thresholds Technical Memorandum (40 KiB)
- Monitoring Well Thresholds TM (2.0 MiB)
- MOU Final As Filed (0.5 MiB)
- MP Reach2B Draft TM Data Needs Survey Approach (3.0 MiB)
- MP Reach2B Initial Options TM (2.9 MiB)
- NFMS R McInnis To Forsythe BA Consult Info Req (3.0 MiB)
- NMFS Addendum (3.1 MiB)
- Nov 2012 Minimum Floodplan Habitat Area (7.2 MiB)
- Nov 2012 PartIII Financial Assistance Update (36 KiB)
- NRDC FWUA Public Scoping Meetings Presentation (2.9 MiB)
- Oct 2012 Reach2B Project Description TM (6.2 MiB)
- Oct 3 Letter to FWS Clarification Alt C (0.9 MiB)
- Part III Guidelines for the Application of Criteria for Financial Assistance for Local Projects (2.2 MiB)
- PEIS/EIR Public Scoping Meetings Presentation (2.3 MiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (82 KiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (0.3 MiB)
- Pit 46e Final Construction Summary (0 B)
- Procedures for the Measurement, Monitoring, and Reporting of Restoration Flows (1.2 MiB)
- Public Scoping Overview Meeting Presentation (0.5 MiB)
- Public Scoping Report (0.3 MiB)
- Public Scoping Report - Appendix A (0.3 MiB)
- Public Scoping Report - Appendix C (22.8 MiB)
- Public Scoping Report And Appendices (49.4 MiB)
- Quantitative Fisheries Model Selection Recommendation Process (0.2 MiB)
- Reach 2B Technical Memorandum on Regulatory Compliance (1.3 MiB)
- Reach 4B Initial Alternatives Technical Memorandum (5.3 MiB)
- Reach 4B Public Scoping Report Addendum (7.0 MiB)
- Reach2B Analytical Tools TM (0.8 MiB)
- Reach2B Scoping Meeting Materials - Attachment B (12.8 MiB)
- Reach2B Scoping Meeting Notification - Attachment A (0.6 MiB)
- Reach2B Scoping Report (0.3 MiB)
- Reach2B Scoping Report - Attachment C (18.1 MiB)
- Reach2B Technical Memorandum on Environmental Field Survey Results (2.9 MiB)
- Restoration Flows Guidelines (5.8 MiB)
- Salmon Conservation Research Facility Permanent Flow Delivery Appraisal Study Report (12.4 MiB)
- San Joaquin River In-channel Capacity Analysis - Appendix C (14.6 MiB)
- San-Joaquin Basin Water Temperature Modeling and Analysis (2.0 MiB)
- Scoping Report Materials - Appendix B (25.0 MiB)
- Sept 2012 NMFS BO (1.5 MiB)
- SJRR Final Boards Station2 (7.8 MiB)
- SJRR Final Boards Station3 (7.3 MiB)
- SJRR Final Boards Station4 (1.0 MiB)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Draft PEISR Librarys (22 KiB)
- SJRRP Framework For Implementation Third Party Draft (1.5 MiB)
- SJRRP Initial Program Alternatives Report (1.9 MiB)
- SJRRP NOP (0.3 MiB)
- SJRRP PEISR NOD (0.6 MiB)
- SJRRP POST CARD - Scoping Meetings (66 KiB)
- SJRRP ProgramUpdate Spring2019 V7 Web (0 B)
- SJRRP Public Involvement Plan (0.3 MiB)
- SJRRP RFG V2.0 FINAL 508 (3.5 MiB)
- SJRRP Scoping Program Public Meeting Agenda (0.2 MiB)
- SJRRP Water Operations Model Work Plan TM Draft (0.2 MiB)
- SJRRP Water Quality Monitoring Plan 2010-2013 (1.5 MiB)
- SMP Draft September 2014 (0.7 MiB)
- Station 5 Reach Program Area (1.4 MiB)
- Stock Selection Strategy: Spring-Run Chinook Salmon (1.7 MiB)
- Technical Memorandum Subsidence Monitoring - Appendix E (4.0 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 (0.5 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix A (0.2 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix B (0.4 MiB)
- Temperature Model Sensitivity Analyses Sets 4 and 5 (0.7 MiB)
- Temperature Model Sensitivity Analysis Set 3 (1.1 MiB)
- Third Parties MOU (0.2 MiB)
- TM Channel Capacity Report - Appendix F (1.1 MiB)
- TM Monitoring Plan for Physical Parameters (3.2 MiB)
- TM Operation Guidelines for Implementing Restoration Flows (3.7 MiB)
- Two-Dimensional Modeling of Reach 1A (4.9 MiB)
- US FWS Addendum (1.8 MiB)
Reach 2b
Technical-memoranda
Landowner Information
General-outreach
Data-reporting
Subsidence Surveys
Monitoring Analysis Plan
Reach 4B
Arroyo Canal and Sack Dam
Friant-Kern Canal
Recapture and Recirculation
Groundwater Banking
Fisheries Reintroduction
Field Advisories
News Releases
Seepage
Water Quality
Subsidence Monitoring
Restoration Goals Meeting Archives
Surface Water
Groundwater Monitoring
Science Meeting
Habitat
Data Download
Final SJR Background Report
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2025 Channel Capacity Report (0 B)
- 2025 Channel Capacity Report Appendix A (7.4 MiB)
- 2025.01.29 WMTF Notes (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- February 2, 2025 (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- Jan2025 WMTF Meeting (0 B)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- Juvenile Spring-Run Chinook Salmon Production, Survival, and Emigration in the San Joaquin River Restoration Area 2020–21 Monitoring and Analysis Report (0 B)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 16 2024 (8.0 MiB)
- SJRRP Operations Dec 20 2024 (8.0 MiB)
- SJRRP Operations Dec 27 2024 (8.0 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations Dec 6 2024 (8.0 MiB)
- SJRRP Operations Feb 14 2025 (8.0 MiB)
- SJRRP Operations Feb 21 2025 (8.0 MiB)
- SJRRP Operations Feb 28 2025 (7.7 MiB)
- SJRRP Operations Feb 7 2025 (8.0 MiB)
- SJRRP Operations Jan 10 2025 (8.0 MiB)
- SJRRP Operations Jan 17 2025 (8.0 MiB)
- SJRRP Operations Jan 24 2025 (8.0 MiB)
- SJRRP Operations Jan 3 2025 (8.0 MiB)
- SJRRP Operations Jan 31 2025 (8.0 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations Mar 14 2025 (7.8 MiB)
- SJRRP Operations Mar 7 2025 (7.8 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 15 2024 (7.9 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Nov 2 2024 (7.9 MiB)
- SJRRP Operations Nov 22 2024 (7.9 MiB)
- SJRRP Operations Nov 29 2024 (8.0 MiB)
- SJRRP Operations Nov 8 2024 (7.9 MiB)
- SJRRP Operations Oct 11 2024 (7.9 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sep 6 2024 (7.8 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)
