- Settlement Related
- Technical Feedback Group Meeting
- Groundwater Report
- Ra Recommendations
- Program-documents
- 10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (2.8 MiB)
- 2010 10 06 AgencyPlan PublicCommentForm (17 KiB)
- 2010 Annual Technical Report - Appendix A (0.8 MiB)
- 2010 Annual Technical Report - Appendix B Reports (0.5 MiB)
- 2010 Annual Technical Report Public Draft (1.2 MiB)
- 2012-2013 Fish Actions (0.1 MiB)
- 2012-2013 Fish Actions Final (0.1 MiB)
- 201208 Part III Guidelines Financial Assistance for Local Projects (1.6 MiB)
- 2014 Restoration Allocation and Default Flow Schedule (0.4 MiB)
- 2015 Restoration Year Channel Capacity Report (3.4 MiB)
- 2015 Revised Framework for Implementation (1.4 MiB)
- 2015 Water Management Goal Investment Strategy Final Report (4.1 MiB)
- 2017 & 2018 SJRRP Annual Report (0 B)
- 2020 Channel Capacity Report (0 B)
- 2022 Channel Capacity Report Final 1 (0 B)
- 2023 Channel Capacity Report (0 B)
- 2025 Draft Channel Capacity Report (0 B)
- Addendum to Public Involvement Plan Environmental Justice (18 KiB)
- Agency Plan Public Comment Form (10 KiB)
- Annual Technical Report - Appendix A (0.8 MiB)
- Appendix A (7.3 MiB)
- Appendix A CCR 2022 1 (0 B)
- Appendix A PEIS/R Text Related to Channel Capacity (0 B)
- Appendix A Program Accomplishments Final 22015 Framework for Implementation (0.6 MiB)
- Appendix B 2020 Levee Capacity Update in the Middle Eastside Bypass (0 B)
- Appendix B 2022 CCR 1 (0 B)
- Appendix C 2022 CCR 1 (0 B)
- Appendix C Bank Erosion Monitoring Report (0 B)
- Appraisal Report AppC SJRRP Cons Facility Water Supply (11.4 MiB)
- Appraisal Report Appendix B SJRRP Cons Facility Water Supply (4.0 MiB)
- Appraisal Report Cons Facility Water Supply (0.5 MiB)
- Appraisal Study Report: Cons Facility Water Supply (22.3 MiB)
- Aug 21 US FWS BO (6.5 MiB)
- CCAG Report Appendix A - 2014 Accessible (0.1 MiB)
- CCAG Report Appendix B 01132015 Accessible (1.4 MiB)
- CCR2017 Final-draft Appendix-A 508 (0.2 MiB)
- CCR2017 Final-draft Appendix-C 508 (2.2 MiB)
- CCR2017 Final-draft Appendix-D 508 (3.6 MiB)
- Channel Capacity Report (0 B)
- Channel Capacity Report (0 B)
- Channel Capacity Report - Appendix A (89 KiB)
- Channel Capacity Report - Appendix A (0.2 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix B (0.4 MiB)
- Channel Capacity Report - Appendix B (14.0 MiB)
- Channel Capacity Report - Appendix C (1.3 MiB)
- Channel Capacity Report - Appendix C (1.2 MiB)
- Channel Capacity Report - Appendix C (14.5 MiB)
- Channel Capacity Report - Appendix D (4.9 MiB)
- Channel Capacity Report - Appendix D (3.3 MiB)
- Channel Capacity Report - Appendix D (1.8 MiB)
- Channel Capacity Report - Appendix E (3.7 MiB)
- Channel Capacity Report - Appendix E (3.0 MiB)
- Channel Capacity Report - Appendix E (5.0 MiB)
- Channel Capacity Report - Appendix F (0.9 MiB)
- Channel Capacity Report - Appendix F (3.9 MiB)
- Channel Capacity Report - Appendix G (2.7 MiB)
- Channel Capacity Report - Appendix H (0.3 MiB)
- Channel Capacity Report 2014 Restoration Year (1.2 MiB)
- Channel Capacity Report 2016 Appendix A (0 B)
- Channel Capacity Report 2016 Appendix B (0 B)
- Channel Capacity Report 2016 Appendix C (0 B)
- Channel Capacity Report 2016 Appendix D (0 B)
- Channel Capacity Report 2016 Appendix E (0 B)
- Channel Capacity Report 2018 Final (4.4 MiB)
- Channel Capacity Report 2018 Public Draft (2.5 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix A (0.3 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix B (1.7 MiB)
- Channel Capacity Report 2018 Public Draft: Appendix C (1.1 MiB)
- Channel Capacity Report 2022 Restoration Year (0 B)
- Channel Capacity Report 2024 1 8 24f 508 (0 B)
- Channel Capacity Report Final - 2014 Accessible (8.3 MiB)
- Channel Capacity Report Publicdraft (4.2 MiB)
- Channel-Capacity-Report 2017 Final 508 (5.2 MiB)
- Chinook Salmon Temporal Occurrence and Environmental Requirements: Preliminary Tables (0.2 MiB)
- Conceptual Models of Stressors and Limiting Factors for San Joaquin River Chinook Salmon (2.0 MiB)
- Dec 2011 FINAL §10(a)1(A), ENHANCEMENT OF SPECIES PERMIT APPLICATION (1.9 MiB)
- Draft Background Report on Friant Dam Operations (1.2 MiB)
- Draft Fisheries Implementation Plan (3.3 MiB)
- Draft Purpose & Need for Action TM (58 KiB)
- Draft Regulatory Compliance Strategy TM (0.7 MiB)
- DRAFT Technical Memorandum: Alternatives Formulation Strategy (0.2 MiB)
- Evaluation of Hills Ferry Barrier Effectiveness at Restricting Chinook Salmon Passage (2.0 MiB)
- Federal Register Notice Of Intent (59 KiB)
- Final Programmatic Biological Assessment (6.2 MiB)
- Final Riparian Habitat Mapping, Monitoring, and Mitigation Plan (0.4 MiB)
- FINAL SJRRP PROGRAM MANAGEMENT PLAN (6.2 MiB)
- Financial Assistance for Local Projects - Part III Guidelines (1.6 MiB)
- Fisheries Management Plan (2.5 MiB)
- Fisheries Management Plan - Exhibit A (2.0 MiB)
- Fisheries Management Plan - Exhibit B (0.3 MiB)
- Fisheries Management Plan - Exhibit C (0.2 MiB)
- Fisheries Management Plan - Exhibit D (1.6 MiB)
- Fisheries Management Plan - Exhibit E (0.5 MiB)
- Fisheries Management Plan - Exhibit F (0.5 MiB)
- FY 13 Final AWP (1.8 MiB)
- FY 14 AWP-Final (1.9 MiB)
- FY 2015 Final Annual Work Plan (2.3 MiB)
- FY2007-2011 Approved, Obligated and Expended Funds (1.0 MiB)
- Hatchery and Genetic Management Plan (2.1 MiB)
- Hydraulic and Sediment Transport Modeling Strategy - Appendix B (1.4 MiB)
- Hydraulic Studies for Fish Habitat Analysis (3.1 MiB)
- Jan 2012 Memo FWS To Forsythe Insufficient Info For ESA (1.3 MiB)
- July 2012 Steelhead Monitoring Plan (1.1 MiB)
- May 8 US FWS Addendum(2) (1.8 MiB)
- Memorandum of Understanding between Plaintiffs and State of California (0 B)
- Middle Eastside Bypass Geotechnical Assessment - Appendix D (1.8 MiB)
- Monitoring Well Thresholds Technical Memorandum (40 KiB)
- Monitoring Well Thresholds TM (2.0 MiB)
- MOU Final As Filed (0.5 MiB)
- MP Reach2B Draft TM Data Needs Survey Approach (3.0 MiB)
- MP Reach2B Initial Options TM (2.9 MiB)
- NFMS R McInnis To Forsythe BA Consult Info Req (3.0 MiB)
- NMFS Addendum (3.1 MiB)
- Nov 2012 Minimum Floodplan Habitat Area (7.2 MiB)
- Nov 2012 PartIII Financial Assistance Update (36 KiB)
- NRDC FWUA Public Scoping Meetings Presentation (2.9 MiB)
- Oct 2012 Reach2B Project Description TM (6.2 MiB)
- Oct 3 Letter to FWS Clarification Alt C (0.9 MiB)
- Part III Guidelines for the Application of Criteria for Financial Assistance for Local Projects (2.2 MiB)
- PEIS/EIR Public Scoping Meetings Presentation (2.3 MiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (82 KiB)
- PEIS/R Text Related to Channel Capacity - Appendix A (0.3 MiB)
- Pit 46e Final Construction Summary (0 B)
- Procedures for the Measurement, Monitoring, and Reporting of Restoration Flows (1.2 MiB)
- Public Scoping Overview Meeting Presentation (0.5 MiB)
- Public Scoping Report (0.3 MiB)
- Public Scoping Report - Appendix A (0.3 MiB)
- Public Scoping Report - Appendix C (22.8 MiB)
- Public Scoping Report And Appendices (49.4 MiB)
- Quantitative Fisheries Model Selection Recommendation Process (0.2 MiB)
- Reach 2B Technical Memorandum on Regulatory Compliance (1.3 MiB)
- Reach 4B Initial Alternatives Technical Memorandum (5.3 MiB)
- Reach 4B Public Scoping Report Addendum (7.0 MiB)
- Reach2B Analytical Tools TM (0.8 MiB)
- Reach2B Scoping Meeting Materials - Attachment B (12.8 MiB)
- Reach2B Scoping Meeting Notification - Attachment A (0.6 MiB)
- Reach2B Scoping Report (0.3 MiB)
- Reach2B Scoping Report - Attachment C (18.1 MiB)
- Reach2B Technical Memorandum on Environmental Field Survey Results (2.9 MiB)
- Restoration Flows Guidelines (5.8 MiB)
- Salmon Conservation Research Facility Permanent Flow Delivery Appraisal Study Report (12.4 MiB)
- San Joaquin River In-channel Capacity Analysis - Appendix C (14.6 MiB)
- San-Joaquin Basin Water Temperature Modeling and Analysis (2.0 MiB)
- Scoping Report Materials - Appendix B (25.0 MiB)
- Sept 2012 NMFS BO (1.5 MiB)
- SJRR Final Boards Station2 (7.8 MiB)
- SJRR Final Boards Station3 (7.3 MiB)
- SJRR Final Boards Station4 (1.0 MiB)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Draft PEISR Librarys (22 KiB)
- SJRRP Framework For Implementation Third Party Draft (1.5 MiB)
- SJRRP Initial Program Alternatives Report (1.9 MiB)
- SJRRP NOP (0.3 MiB)
- SJRRP PEISR NOD (0.6 MiB)
- SJRRP POST CARD - Scoping Meetings (66 KiB)
- SJRRP ProgramUpdate Spring2019 V7 Web (0 B)
- SJRRP Public Involvement Plan (0.3 MiB)
- SJRRP RFG V2.0 FINAL 508 (3.5 MiB)
- SJRRP Scoping Program Public Meeting Agenda (0.2 MiB)
- SJRRP Water Operations Model Work Plan TM Draft (0.2 MiB)
- SJRRP Water Quality Monitoring Plan 2010-2013 (1.5 MiB)
- SMP Draft September 2014 (0.7 MiB)
- Station 5 Reach Program Area (1.4 MiB)
- Stock Selection Strategy: Spring-Run Chinook Salmon (1.7 MiB)
- Technical Memorandum Subsidence Monitoring - Appendix E (4.0 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 (0.5 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix A (0.2 MiB)
- Temperature Model Sensitivity Analyses Sets 1 & 2 - Appendix B (0.4 MiB)
- Temperature Model Sensitivity Analyses Sets 4 and 5 (0.7 MiB)
- Temperature Model Sensitivity Analysis Set 3 (1.1 MiB)
- Third Parties MOU (0.2 MiB)
- TM Channel Capacity Report - Appendix F (1.1 MiB)
- TM Monitoring Plan for Physical Parameters (3.2 MiB)
- TM Operation Guidelines for Implementing Restoration Flows (3.7 MiB)
- Two-Dimensional Modeling of Reach 1A (4.9 MiB)
- US FWS Addendum (1.8 MiB)
- Reach 2b
- Technical-memoranda
- Landowner Information
- General-outreach
- Data-reporting
- Subsidence Surveys
- Monitoring Analysis Plan
- Reach 4B
- Arroyo Canal and Sack Dam
- Friant-Kern Canal
- Recapture and Recirculation
- Groundwater Banking
- Fisheries Reintroduction
- Field Advisories
- News Releases
- Seepage
- Water Quality
- Subsidence Monitoring
- Restoration Goals Meeting Archives
- Surface Water
- Groundwater Monitoring
- Science Meeting
- Habitat
- Data Download
- Final SJR Background Report
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- Juvenile Spring-Run Chinook Salmon Production, Survival, and Emigration in the San Joaquin River Restoration Area 2020–21 Monitoring and Analysis Report (0 B)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 15 2024 (7.9 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Nov 2 2024 (7.9 MiB)
- SJRRP Operations Nov 8 2024 (7.9 MiB)
- SJRRP Operations Oct 11 2024 (7.9 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sep 6 2024 (7.8 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)