Settlement Related
Technical Feedback Group Meeting
Groundwater Report
Ra Recommendations
Program-documents
Reach 2b
Technical-memoranda
Landowner Information
General-outreach
Data-reporting
- 2010 Annual Report - Appendix A (0.8 MiB)
- 2010 Annual Technical Report (1.0 MiB)
- 2010 Annual Technical Report - Appendix B (10.6 MiB)
- 2010 Annual Technical Report Draft 1 - Appendix A (1.8 MiB)
- 2010 Draft 1 Technical Report - Appendix A (1.8 MiB)
- 2011 Annual Technical Report - Appendix A Reports 26-35 (6.3 MiB)
- 2011 Annual Technical Report Appendix A Reports 6-18 (4.2 MiB)
- 2011 Draft Annual Technical Report - Appendix A (0.8 MiB)
- 2011 Draft Annual Technical Report - Appendix B (12.9 MiB)
- 2011 Draft Annual Technical Report - Appendix B (12.9 MiB)
- 2012 2D Temperature Modeling of Gravel Pits in Reach 1A (20 KiB)
- 2012 Adult Chinook Transportation Study Year 1 Report (1.1 MiB)
- 2012 ATR 1AFineSedimentIncubationHabitat (19 KiB)
- 2012 ATR 2AChannelResponse (24 KiB)
- 2012 ATR Levee Geotech Maps (1.5 MiB)
- 2012 ATR LeveeGeotech (13 KiB)
- 2012 ATR Monitoring Cross Sections Topo (12.9 MiB)
- 2012 ATR Summary - Monitoring Cross Section Surveys (43 KiB)
- 2012 ATR Summary Captive Rearing BDE (49 KiB)
- 2012 ATR Water Level Recorders (21 KiB)
- 2012 ATR Water Level Recorders (21 KiB)
- 2012 Data Update (38.6 MiB)
- 2012 Draft Technical Memorandum - Evaluation of Partial Fish Barriers (13.8 MiB)
- 2012 Evaluation of Partial Fish Passage Barriers (13.8 MiB)
- 2012 Mid-Year Technical Report - Report 7 (0.4 MiB)
- 2012 Millerton Temperature Monitoring Summary (17.3 MiB)
- 2012 SJRRP DRAFT Thermal Refugia Summary Report (51 KiB)
- 2012 SJRRP Fish Habitat Study Final (3.0 MiB)
- 2012 Sjrrp Water Quality (1.0 MiB)
- 2012 Summary Pebblecountdata Egordon (23 KiB)
- 2012 Summary Pebblecountdata Egordon (23 KiB)
- 2012 Surface Water Quality Annual Technical Report (0.5 MiB)
- 2012 Technical Report - Flow Gage Analysis (2.9 MiB)
- 2012 USGS Sediment Appendix Methodology (14 KiB)
- 2012 USGS Sediment ReportingSummary (17 KiB)
- 2012 Water Temperature Summary (2.3 MiB)
- 2012 Water Year Annual Report - Stream Temperature Monitoring Study (50.5 MiB)
- 2012-2013 Butte Creek Juvenile Chinook Salmon Monitoring (0.1 MiB)
- 2012-2013 USBR Inventory Monitoring (2.2 MiB)
- 2012-2013 USBR Inventory Monitoring (2.2 MiB)
- 2012ATR 1AFineSedimentIncubationHabitat Charts (37 KiB)
- 2012ATR 1AGravelMobility Maps (5.6 MiB)
- 2012ATR 2AChannelResponse Data (12.8 MiB)
- 2012ATR WaterLevelRecorders (3.3 MiB)
- 2012ATR WaterLevelRecorders (3.3 MiB)
- 2013 2D Temperature Modeling (43 KiB)
- 2013 Additional Water Level Recorders (0.8 MiB)
- 2013 Annual Report - Vegetation Response to Interim Flows (11.0 MiB)
- 2013 Annual Technical Report - Additional Water Level Recorders (1.3 MiB)
- 2013 AT Summary - Bed Sampling (0.2 MiB)
- 2013 ATR Water Level Recorders (0.1 MiB)
- 2013 ATR Water Level Recorders (0.1 MiB)
- 2013 Bed Material Data Processing and Evaluation (43 KiB)
- 2013 Continuous Surrogate Measurements of Bedload Sediment Transport using Hydrophone Installations (44 KiB)
- 2013 DFW - Water Temperature Monitoring (1.0 MiB)
- 2013 DFW Captive Rearing (42 KiB)
- 2013 DFW Rotary Screw Trap (15 KiB)
- 2013 DFW TrapHaul (14 KiB)
- 2013 DFW Water Temperature Monitoring Summary and Data (1.0 MiB)
- 2013 Draft Technical Memorandum - Flow Loss Analysis (1.7 MiB)
- 2013 DWR Hwy99 Data (23 KiB)
- 2013 DWR Monitoring-Cross-Section Data (16 KiB)
- 2013 DWR Water Level Recorder Data (3.4 MiB)
- 2013 DWR Water-Level-Recorder (0.1 MiB)
- 2013 DWR Water-Level-Recorder AppA (1.6 MiB)
- 2013 DWR Water-Level-Recorder Data (3.4 MiB)
- 2013 DWR Water-Level-Recorder(2) (0.1 MiB)
- 2013 Juvenile Survival and Migration (0.1 MiB)
- 2013 MAP Study 13 SJLE Project Summary (95 KiB)
- 2013 Mid-Year Surface Water Quality Report (0.6 MiB)
- 2013 Millerton-Temperature Monitoring (39.9 MiB)
- 2013 Millerton-Temperature-Monitoring (39.9 MiB)
- 2013 SJRRP Steelhead Monitoring Plan (2.8 MiB)
- 2013 SR Hwy99 Water Surface Elevation Analysis (17 KiB)
- 2013 Surface Water Quality Report (2.0 MiB)
- 2013 USBR Millerton Lake Temperature Monitoring (0.4 MiB)
- 2013 USBR Millerton-Lake-Temp-Monitoring (0.4 MiB)
- 2013 USBR SJRRP WQ-Data (0.9 MiB)
- 2013 USBR Trap-& Haul Summary (1.1 MiB)
- 2013 USBR Trap-&-Haul-Summary (1.1 MiB)
- 2013 USBR Water Quality Study (2.0 MiB)
- 2013 USGS Hydrophones (31 KiB)
- 2013 USGS TributaryStudy (14 KiB)
- 2013 USGS-Sediment Monitoring (22 KiB)
- 2013 USGS-Sediment-Monitoring (22 KiB)
- 2013 Water Temperature Study Map (1.1 MiB)
- 2013 Water Year Mid-Year -Summary of Water Temperature Monitoring (0.1 MiB)
- 2013-2014 Butte Creek Spring-Run Chinook Salmon Life History Investigation (49 KiB)
- 2013ATR Temperature Data (12.0 MiB)
- 2014 Annual Report - Vegetation Response to Interim Flows (31.9 MiB)
- 2014 Final Technical Report: Analysis of Fish Benefits of Reach 2B Alternatives (3.6 MiB)
- 2014 Mid-Year ATR - Water Level Recorders Charts (1.3 MiB)
- 2014 Mid-Year ATR Water Level Recorders Charts (1.3 MiB)
- 2014 Mid-Year Technical Report - 2013 Assessment of Predator Abundance and Distribution (0.2 MiB)
- 2014 Mid-Year Technical Report - 2013 Assessment of Predator Abundance and Distribution in Mine Pit Habitat in the SJRRP Area (0.2 MiB)
- 2014 Mid-Year Technical Report - 2013 Juvenile Survival and Migration (0.7 MiB)
- 2014 Mid-Year Technical Report - 2013-2014 Fish Assemblage Inventory and Monitoring (0.7 MiB)
- 2014 Mid-Year Technical Report - 2014 Egg Survival and Emergence in Reaches 1A and 1B (1.6 MiB)
- 2014 Mid-Year Technical Report - Effects Of A Riparian Forest On Water Temperatures (2.4 MiB)
- 2014 Mid-Year Technical Report - Reducing Spring Water Temperatures Below Sack Dam (1.6 MiB)
- 2014 Piscine Predators and Control Measures (0.4 MiB)
- 2014 Technical Memorandum Fish Passage Task 2 Addendum (4.9 MiB)
- 2014 Technical Report - Science & Technology Proposal (0.9 MiB)
- 2014 Temperature Monitoring of the Cold Water Pool in Millerton Lake (0.2 MiB)
- 2014 Temperature Monitoring of the Cold Water Pool in Millerton Lake (0.4 MiB)
- 2014 TM - Soil Salinity Monitoring Report (8.7 MiB)
- 2014 Water Quality Report - Continuous Monitoring (1.2 MiB)
- 2019 Adult SR Monitoring Trap And Haul Report FINAL (0 B)
- Additional Water Level Recorders-formatted (0.8 MiB)
- Adult Passage (47 KiB)
- Adult Passage-formatted(2) (47 KiB)
- Assessment Of Predator Abundance-formatted (0.3 MiB)
- BCCSJR-ADA (2.4 MiB)
- Draft 508 MLT July 05 Summary And Photographs 093019 (1) (0 B)
- DWR Fish Passage Final Task 2 AddendumF(2) (4.9 MiB)
- Effect Of Altered Flow Regime (45 KiB)
- Effect Of Scour And Deposition on Incubation Habitat in Reach 1A (97 KiB)
- Fish Assemblage Inventory And Monitoring (0.3 MiB)
- June 2014 ATR (4.9 MiB)
- Levee Geotechnical Exploration (0.1 MiB)
- May 2014 Central Valley Steelhead Monitoring Plan (2.4 MiB)
- Monitoring Cross Section Resurveys-formatted (0.2 MiB)
- MUDSL-ADA (1.8 MiB)
- MWA-ADA (2.4 MiB)
- Parcel Groups Prioritized by Flow Threshold (0.8 MiB)
- Pdf-sample (8 KiB)
- PIT Tag Monitoring Summary (0.6 MiB)
- Progress Report-SJRRP BMI SWAMP BA AL 12212012 (0.8 MiB)
- Reach 1A Spawning Area Bed Mobility (96 KiB)
- Reach1a HSI Results Gdb (6.6 MiB)
- SalinityStudy Aug2013 (8.4 MiB)
- SALTS-ADA (1.8 MiB)
- San Joaquin 2012 Final Report (10.7 MiB)
- San-Joaquin River PIT Tag Monitoring Summary (0.6 MiB)
- SJRAMUD-ADA (0.2 MiB)
- SJRASALT-ADA (1.8 MiB)
- SJRBRB-ADA (2.4 MiB)
- SJRBSALT-ADA (1.8 MiB)
- SJRCC-ADA (2.0 MiB)
- SJRRP Fish Passage Evaluation Task 2 Addendum TM (4.9 MiB)
- SJRRP Hyrdrophone Summary ADA (0.4 MiB)
- SJRRP-Thermal-Refugia-Report-FINAL (14.0 MiB)
- SJRSCI-ADA (2.4 MiB)
- SJRSIDS-ADA (1.8 MiB)
- SJRSM-ADA (2.4 MiB)
- SJRSP-ADA (2.4 MiB)
- SJRSTV-ADA (0.8 MiB)
- SJRTHOMAS-ADA (2.4 MiB)
- SJRUSBIFUR-ADA (2.3 MiB)
- SJRUSCBC-ADA (2.4 MiB)
- SJRUSHWY152-ADA (2.4 MiB)
- SJRV2-ADA (2.4 MiB)
- SJRWU-ADA (1.8 MiB)
- Soil Salinity Report (8.7 MiB)
- SR 99 Surface Elevation Analysis (18 KiB)
- Temperature Data Files (8.7 MiB)
- Temperature Monitoring Of The Cold Water Pool-formatted (0.3 MiB)
- TempMonitoring (93.0 MiB)
- Thermal Refuge Data (3.3 MiB)
- Toxicity Report Final (0.6 MiB)
- TOXICITY TO DAPHNIA: IMPLICATIONS FOR CHINOOK SALMON REPORT (0.6 MiB)
- USGSADR2013SJRRPmanuscripts-Compressed (zipped) Folder (0.6 MiB)
- Vegetation Monitoring (2.8 MiB)
- Vegetation Monitoring along the San Joaquin River - 2019 Report (0 B)
- VermeyenData 2014 (33.1 MiB)
- Water Level Recorders ADA (0.1 MiB)
- Water Quality Report - Continuous Monitoring (1.2 MiB)
- Water Temperature Study Map (1.1 MiB)
- Water Year 2013 Flow Accounting (0.2 MiB)
- Water Year 2013 Table 1 Temperature Monitoring Sites (0.1 MiB)
- Water Year 2013 Table 1 Temperature Monitoring Sites (0.1 MiB)
Subsidence Surveys
Monitoring Analysis Plan
Reach 4B
Arroyo Canal and Sack Dam
Friant-Kern Canal
Recapture and Recirculation
Groundwater Banking
Fisheries Reintroduction
Field Advisories
News Releases
Seepage
Water Quality
Subsidence Monitoring
Restoration Goals Meeting Archives
Surface Water
Groundwater Monitoring
Science Meeting
Habitat
Data Download
Final SJR Background Report
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2025 Channel Capacity Report (0 B)
- 2025 Channel Capacity Report Appendix A (7.4 MiB)
- 2025.01.29 WMTF Notes (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- February 2, 2025 (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- Jan2025 WMTF Meeting (0 B)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- Juvenile Spring-Run Chinook Salmon Production, Survival, and Emigration in the San Joaquin River Restoration Area 2020–21 Monitoring and Analysis Report (0 B)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 16 2024 (8.0 MiB)
- SJRRP Operations Dec 20 2024 (8.0 MiB)
- SJRRP Operations Dec 27 2024 (8.0 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations Dec 6 2024 (8.0 MiB)
- SJRRP Operations Feb 14 2025 (8.0 MiB)
- SJRRP Operations Feb 21 2025 (8.0 MiB)
- SJRRP Operations Feb 28 2025 (7.7 MiB)
- SJRRP Operations Feb 7 2025 (8.0 MiB)
- SJRRP Operations Jan 10 2025 (8.0 MiB)
- SJRRP Operations Jan 17 2025 (8.0 MiB)
- SJRRP Operations Jan 24 2025 (8.0 MiB)
- SJRRP Operations Jan 3 2025 (8.0 MiB)
- SJRRP Operations Jan 31 2025 (8.0 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations Mar 14 2025 (7.8 MiB)
- SJRRP Operations Mar 7 2025 (7.8 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 15 2024 (7.9 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Nov 2 2024 (7.9 MiB)
- SJRRP Operations Nov 22 2024 (7.9 MiB)
- SJRRP Operations Nov 29 2024 (8.0 MiB)
- SJRRP Operations Nov 8 2024 (7.9 MiB)
- SJRRP Operations Oct 11 2024 (7.9 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sep 6 2024 (7.8 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)
