Settlement Related
Technical Feedback Group Meeting
Groundwater Report
Ra Recommendations
Flow Schedule
Flow Recommendations
- 2013 RA INTERIM FLOW PROGRAM RECOMMENDATIONS (0.3 MiB)
- April 12 Updated RA INTERIM FLOW PROGRAM RECOMMENDATIONS (0.3 MiB)
- Fall 2013 RA Flow Recommendation 10-22-2013 (0.3 MiB)
- February 13 2019 RA Flow Recommendation (0 B)
- February 6, 2021 RA Flow Recommendation Final (0 B)
- June 8 2018 RA Flow Recommendation (0.2 MiB)
- May 10 RA Revised Updated Flow Recommendations (0.6 MiB)
- May 14 2019 RA Flow Recommendation Final (0 B)
- May 15 Updated RA Interim Flow Recommendation (91 KiB)
- May 17 RA Flow Schedule Recommendations (0.1 MiB)
- May 22, 2018 SJRRP Restoration Allocation (0.6 MiB)
- May RA Flow Recommendation Updates (0.4 MiB)
- Nov 14 RA Draft Pulse Flow Recommendations (52 KiB)
- RA Revised Interim Flow Recommendations (0.1 MiB)
- Spring RA Flow Recommendation (0.5 MiB)
- 2008 RA Annual Report Final (0.2 MiB)
- 2009 RA Annual Report April Final (1.2 MiB)
- 20130517 Meade To Mitchener Accepting May 17 Allocation And Default Schedule (0.2 MiB)
- 20130613 Meade To Borah Accepting June 11 Allocation And Default Schedule May 29 Forecast (0.2 MiB)
- 2014 RA Report To Settling Parties Final (0.3 MiB)
- 2016 Restoration Allocation & Default Flow Schedule (0.7 MiB)
- 2017 Restoration Allocation & Default Flow Schedule (0.4 MiB)
- 20190117 SJRRP Initial Restoration Allocation (0 B)
- 20190208 Restoration Allocation Updated (0 B)
- : RA Recommendation for 2012 Priority Monitoring and Assessment Actions (0.3 MiB)
- ACOE Friant Dam Flood Control Requirements Presentation (0.1 MiB)
- Addendum to Final 2023 Restoration Allocation & Default Flow Schedule September 26, 2023 (0 B)
- April 1 RA Acknowledgements (71 KiB)
- April 1 RA Recommendations (94 KiB)
- April 1 RA Transmittal For 2014 Annual Report (0.2 MiB)
- April 12, 2019 SJRRP Restoration Allocation Update (0 B)
- April 17, 2020 RA Flow Recommendation Final (0 B)
- April 21, 2017 RA Flow Recommendation (83 KiB)
- April 26, 2024 RA Flow Recommendations (0 B)
- April 27 RA INTERIM FLOW PROGRAM RECOMMENDATIONS (0.3 MiB)
- April 28, 2020 RA Flow Recommendation Final (0 B)
- April 30 RA Recommendations Temporary Flow Reductions (34 KiB)
- April 5, 2022 Restoration Administrator Flow Recommendation (0 B)
- ct: Updated RA Interim Flow Release Recommendations (0.4 MiB)
- Dec 1 RA Recommendation Report Chowchilla Bypass (0.2 MiB)
- Dec 15 DWR Water Supply Forecasting Presentation (0.4 MiB)
- Dec 15 SAN JOAQUIN RIVER FORECASTING WORKSHOP PRESENTATION (1.0 MiB)
- December 11, 2023 Restoration Administrator Flow Recommendation (0 B)
- December 21 2017 RA Flow Recommendation (97 KiB)
- Feb 21 Fall Run Chinook Salmon Technical Recommendations (0.1 MiB)
- Feb 26 RA Flow Recommendation (83 KiB)
- Feb 5 RA Flow Recommendation (96 KiB)
- Feb RA Recommended IF Release Schedule (0.2 MiB)
- Feb Recommendations on Monitoring and Evaluating Interim Flows to the Upper SJR (3.6 MiB)
- February 1, 2017 RA Recommendation (0.1 MiB)
- February 1, 2018 RA Flow Recommendation (0.2 MiB)
- February 11, 2019 SJRRP Restoration Allocation Update (0 B)
- February 13 2019 RA Flow Recommendation (0 B)
- February 19, 2020 SJRRP Updated Restoration Allocation (0 B)
- February 2, 2021 SJRRP Restoration Allocation Update (0 B)
- February 24, 2025 Flow Recommendation (0.4 MiB)
- February 26, 2018 RA Flow Recommendation (0.1 MiB)
- February 26, 2019 SJRRP Restoration Allocation Update (0 B)
- February 29 2024 Flow Recommendation (0 B)
- February 5, 2023 Restoration Administrator Flow Recommendation (0 B)
- February 6, 2017 RA Flow Schedule (46 KiB)
- February 6, 2021 RA Flow Recommendation Final (0 B)
- February 6, 2021 RA Flow Recommendation Update (0 B)
- Final 2021 Restoration Allocation & Default Flow Schedule (0 B)
- Final 2022 Restoration Allocation & Default Flow Schedule May 13, 2022 (0 B)
- Final 2023 Restoration Allocation & Default Flow Schedule May 18, 2023 (0 B)
- Final RA Annual Report (1.7 MiB)
- Final Recommendations on Restoring Spring-run Chinook Salmon to the Upper SJR (0.8 MiB)
- Initial 2021 Restoration Allocation and Default Flow Schedule (0 B)
- Initial 2022 Restoration Allocation & Default Flow Schedule (0 B)
- Initial 2023 Restoration Allocation & Default Flow Schedule (0 B)
- Initial 2024 Restoration Allocation and Default Flow Schedule (0 B)
- Initial 2025 Restoration Allocation & Default Flow Schedule January 22, 2025 (0 B)
- January 16, 2020 SJRRP Initial Restoration Allocation (0 B)
- January 30, 2024 Restoration Administrator Flow Recommendation (0 B)
- January 31, 2020 RA Flow Recommendation (0 B)
- January 31, 2025 Flow Recommendation (0 B)
- July 13 RA Flow Recommendations (0.2 MiB)
- July 21, 2017 RA Flow Recommendation (0.1 MiB)
- June 1, 2021 RA Flow Recommendation Final (0 B)
- June 16 RA Flow Recommendation (0.1 MiB)
- June 2, 2020 RA Flow Recommendation Final (0 B)
- June 30, 2023 Restoration Administrator Flow Recommendation (0 B)
- June 8 2017 RA Flow Recommendation (0.1 MiB)
- June 8 2018 RA Flow Recommendation (0.2 MiB)
- June 8, 2017 RA Flow Recommendation (0.1 MiB)
- Letter 3rd Parties (0.2 MiB)
- March 1, 2022 RA Flow Recommendation (0 B)
- March 20 RA Interim Flow Recommendations (0.2 MiB)
- March 20, 2020 SJRRP Updated Restoration Allocation (0 B)
- March 21, 2023 Restoration Administrator Flow Recommendation (0 B)
- March 29 RA Flow Recommendation (0.2 MiB)
- May 12, 2021 RA Flow Recommendation Final (0 B)
- May 14 2019 RA Flow Recommendation Final (0 B)
- May 16, 2019 RA Schedule Approval Table (0 B)
- May 17, 2020 SJRRP Updated Restoration Allocation (0 B)
- May 2 RA INTERIM FLOW PROGRAM RECOMMENDATIONS (0.1 MiB)
- May 20, 2019 SJRRP Restoration Allocation Final (0 B)
- May 21 Updated RA Recommendation (52 KiB)
- May 22, 2024 Flow Recommendation (0 B)
- May 28 RA Interim Flow Schedule Recommendations (0.1 MiB)
- May-3 RA Flow Recommendation FinalV2 (0.1 MiB)
- NOAA CNRFC Forecast Methods, Products, and Forecast Methods, Products, and Services Presentation (3.0 MiB)
- Nov 15 Letter RA Recommendations Response (0.1 MiB)
- Nov RA Recommendation Attachment (0.1 MiB)
- Nov RA Recommendation Rescheduled IFs (0.1 MiB)
- November 15, 2021 RA Flow Recommendation (0 B)
- November 2, 2023 Restoration Administrator Flow Recommendation (0 B)
- Oct 17 RA Flow Recommendation (79 KiB)
- Oct 31 RA Recommendations IF Revised (72 KiB)
- October 18 2018 RA Flow Recommendation (0 B)
- October 28 2019 RA Flow Recommendation Final (0 B)
- RA 2012 Annual Report (1.2 MiB)
- RA 2014 Annual Report Cover Ltr (0.2 MiB)
- RA Fall Pulse Flow Recommendations (78 KiB)
- RA Recommendation to Evaluate Reoperation of the Chowchilla Bypass (0.1 MiB)
- RA Recommendations for the 2010 Interim Flow Program (0.4 MiB)
- RA Signed Trans Letter Chowchilla Bi Structure (2.2 MiB)
- Recommendations on Restoring Fall-run Chinook Salmon to the Upper San Joaquin River (0.4 MiB)
- Recommendations on Restoring Spring-run Chinook Salmon to the Upper San Joaquin River Letter (12 KiB)
- RECOMMENDATIONS TO THE SECRETARY OF THE INTERIOR: INTERIM FLOW RELEASES FROM FRIANT DAM (0.6 MiB)
- Restoration Allocation & Default Flow Schedule May 17, 2024 (0 B)
- SCE Operational Inflow Forecasting Operational Inflow Forecasting and Water Management Presentation (2.3 MiB)
- September 18, 2020 RA Flow Recommendation Final (0 B)
- SJRRP Allocation and Default Flow Schedule May 14 Update (0.3 MiB)
- SJRRP Allocation and Default Schedule May 29 Updated (0.1 MiB)
- SJRRP Allocation May 1 Most Probable Forecast 20130513 (0.8 MiB)
- Spring 2011 RA Recommendations (0.9 MiB)
- Transmittal of the 2012 Restoration Administrator Annual Report (0.3 MiB)
- Transmittal of the 2012 Restoration Administrator Interim Flow Program Recommendations (0.6 MiB)
- Transmittal of the San Joaquin River Restoration Program (SJRRP) Restoration Administrator (RA) 2010 Annual Report (0.6 MiB)
- Updated 2018 Restoration Allocation & Default Flow Schedule Approved (0.2 MiB)
- Updated 2021 Restoration Allocation & Default Flow Schedule (0 B)
- Updated 2021 Restoration Allocation & Default Flow Schedule (0 B)
- Updated 2022 Restoration Allocation & Default Flow Schedule (0 B)
- Updated 2022 Restoration Allocation & Default Flow Schedule April 18, 2022 (0 B)
- Updated 2022 Restoration Allocation & Default Flow Schedule March 25, 2022 (0 B)
- Updated 2023 Restoration Allocation & Default Flow Schedule April 20, 2023 (0 B)
- Updated 2023 Restoration Allocation & Default Flow Schedule March 14, 2023 (0 B)
- Updated 2024 Restoration Allocation & Default Flow Schedule April 11, 2024 (0 B)
- Updated 2024 Restoration Allocation & Default Flow Schedule February 16, 2024 (0 B)
- Updated 2025 Restoration Allocation & Default Flow Schedule March 17, 2025 (0 B)
- Updated RA Interim Flow Program Recommendations (0.1 MiB)
- UPDATED RA INTERIM FLOW RECOMMENDATIONS (0.1 MiB)
- Updated RA Interim Flow Release Recommendations (87 KiB)
- Updated Recommendation for 2022 Restoration Flows (0 B)
- WY Allocation 2010 IFs 04292010 (1.4 MiB)
- WY Allocation 2010 IFs 05172010 (1.4 MiB)
Program-documents
Reach 2b
Technical-memoranda
Landowner Information
General-outreach
Data-reporting
Subsidence Surveys
Monitoring Analysis Plan
Reach 4B
Arroyo Canal and Sack Dam
Friant-Kern Canal
Recapture and Recirculation
Groundwater Banking
Fisheries Reintroduction
Field Advisories
News Releases
Seepage
Water Quality
Subsidence Monitoring
Restoration Goals Meeting Archives
Surface Water
Groundwater Monitoring
Science Meeting
Habitat
Data Download
Final SJR Background Report
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2025 Channel Capacity Report (0 B)
- 2025 Channel Capacity Report Appendix A (7.4 MiB)
- 2025.01.29 WMTF Notes (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- February 2, 2025 (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- Jan2025 WMTF Meeting (0 B)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- Juvenile Spring-Run Chinook Salmon Production, Survival, and Emigration in the San Joaquin River Restoration Area 2020–21 Monitoring and Analysis Report (0 B)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 16 2024 (8.0 MiB)
- SJRRP Operations Dec 20 2024 (8.0 MiB)
- SJRRP Operations Dec 27 2024 (8.0 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations Dec 6 2024 (8.0 MiB)
- SJRRP Operations Feb 14 2025 (8.0 MiB)
- SJRRP Operations Feb 21 2025 (8.0 MiB)
- SJRRP Operations Feb 28 2025 (7.7 MiB)
- SJRRP Operations Feb 7 2025 (8.0 MiB)
- SJRRP Operations Jan 10 2025 (8.0 MiB)
- SJRRP Operations Jan 17 2025 (8.0 MiB)
- SJRRP Operations Jan 24 2025 (8.0 MiB)
- SJRRP Operations Jan 3 2025 (8.0 MiB)
- SJRRP Operations Jan 31 2025 (8.0 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations Mar 14 2025 (7.8 MiB)
- SJRRP Operations Mar 7 2025 (7.8 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 15 2024 (7.9 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Nov 2 2024 (7.9 MiB)
- SJRRP Operations Nov 22 2024 (7.9 MiB)
- SJRRP Operations Nov 29 2024 (8.0 MiB)
- SJRRP Operations Nov 8 2024 (7.9 MiB)
- SJRRP Operations Oct 11 2024 (7.9 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sep 6 2024 (7.8 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)
