Settlement Related
Technical Feedback Group Meeting
Groundwater Report
Ra Recommendations
Program-documents
Reach 2b
Technical-memoranda
Landowner Information
General-outreach
Data-reporting
Subsidence Surveys
Monitoring Analysis Plan
Reach 4B
Arroyo Canal and Sack Dam
Friant-Kern Canal
Recapture and Recirculation
Groundwater Banking
Fisheries Reintroduction
Field Advisories
Eblasts
- 2019 Merced NWR Weir Removal Field Advisory (0 B)
- 2019 Merced NWR well installation (0 B)
- 2019-20 Rotary Screwtrap Monitoring (0 B)
- 2019-20 Steelhead Monitoring (0 B)
- 2022 adult spring-run Chinook salmon monitoring (0 B)
- 2023-24 Rotary Screw Trap Field Advisory October 2023 (0 B)
- 2023-24 Steelhead Monitoring Field Advisory (0 B)
- Adult Holding And Spawning Studies (0 B)
- Adult Spring-Run Chinook Salmon Migration and Habitat Study (55 KiB)
- Adult Spring-Run Chinook Salmon Migration and Holding Habitat Study April 2022-August 2022 (0 B)
- Advisory Reach 3 and 4A Hydraulic Conductivity Analyses (45 KiB)
- Aerial Surveys From Friant Dam to the Merced River Confluence and Bypasses (79 KiB)
- Aerial Surveys near the Friant-Kern Canal and Madera Canal (72 KiB)
- August - September 2021 Sack Dam Field Advisory (0 B)
- Bathymetric Surveys (0.1 MiB)
- Bathymetric Surveys in Portions of Reach 4 and the Eastside Bypass (33 KiB)
- Bathymetric Surveys in Reach 2B (48 KiB)
- Bathymetric Surveys in Reach 3 (0.1 MiB)
- Bathymetric Surveys in Reach 3 (41 KiB)
- Benthic Macroinvertebrate Bioassessment (BMI) Study (0.1 MiB)
- Biological and Cultural Resource Field Surveys in Reach 2B (28 KiB)
- Biological and Cultural Resource Field Surveys in Reach 4B (33 KiB)
- Biological and Cultural Resource Field Surveys in Reach 4B (39 KiB)
- Biological field surveys in certain areas of the Eastside Bypass (25 KiB)
- Biological Resource Field Surveys for Small Mammals and Wildlife Habitat in Support of the Mendota Pool Bypass and Reach 2B Improvements Project (35 KiB)
- CA Central Valley Steelhead Monitoring Plan (0.2 MiB)
- California Central Valley Steelhead Monitoring Plan (0 B)
- California Central Valley Steelhead Monitoring Plan December 1, 2020 - April 30, 2021 (0 B)
- California Central Valley Steelhead Monitoring Plan December 1, 2024 - April 30, 2025 (0 B)
- California State Lands Commision Verification Survey (33 KiB)
- California State Lands Commission Boundary Surveys (40 KiB)
- California State Lands Commission Verification Survey – Reaches 3 and 4A (28 KiB)
- Central Valley Steelhead Detection and Monitoring Study (0.1 MiB)
- Central Valley Steelhead Monitoring (0.4 MiB)
- Chinook Salmon Egg Survival and Emergence Monitoring (0.1 MiB)
- Chowchilla and Eastside Bypass Surface Sediment Sampling (93 KiB)
- Eastside and Mariposa Bypass Surveys (35 KiB)
- Eastside Bypass and Reach 2A Geotechnical Investigations; Standard and Cone Penetration Tests (0.1 MiB)
- Eastside Bypass Topographic Surveys at the Merced National Wildlife Refuge Upper and Lower Weirs (45 KiB)
- FAQ Spring and Early Fall Biological Resources Surveys (27 KiB)
- FAQ Summer Biological and Cultural Resource Surveys (32 KiB)
- Field Activity Advisory October 9 2012 (56 KiB)
- Field Activity Advisory California Central Valley Spring-run Chinook Salmon Trap and Haul March 1, 2024 – June 30, 2024 (0 B)
- Field Activity Advisory Adult Holding and Spawning Habitat Study June 2020 - February 2021 (0 B)
- Field Activity Advisory Adult Trap and Haul March 1, 2025 - June 30, 2025 (0 B)
- Field Activity Advisory California Central Valley Steelhead Monitoring Plan (0 B)
- Field Activity Advisory California Central Valley Steelhead Monitoring Plan December 1, 2022 - April 30, 2023 (0 B)
- Field Activity Advisory Eastside Bypass Improvements Project Removal of the Upper Weir (0 B)
- Field Activity Advisory Monitoring Network Survey (0 B)
- Field Activity Advisory Reach 2B Geophysical Surveys November 2020 (0 B)
- Field Activity Advisory Reach 2B Geotechnical Explorations December 2022 - February 2023 (0 B)
- Field Activity Advisory Reach 2B Geotechnical Explorations November 2021- February 2022 (0 B)
- Field Activity Advisory Reach 3 Geophysical Surveys June 2020 (0 B)
- Field Activity Advisory Reach 3 Geophysical Surveys March 2020 (0 B)
- Field Activity Advisory Rotary Screw Trap Monitoring to Estimate Juvenile Spring-Run Chinook Salmon Production, Survival and Emigration in the San Joaquin River Restoration Area (0 B)
- Field Activity Advisory Rotary Screw Trap Monitoring to Estimate Juvenile Spring-Run Chinook Salmon Production, Survival and Emigration in the San Joaquin River Restoration Area November 2024 – June 2025 (0 B)
- Field Activity Advisory Spawning Sucess Aug-Dec 2024 (0 B)
- Field Activity Advisory Spring-Run Chinook Salmon Juveniles Scheduled for Release February 14 - March 31, 2022 (0 B)
- Field Activity Advisory Spring-Run Chinook Salmon Yearling Release December 8, 2022 (0 B)
- Field Activity Advisory Telemetry of Juvenile Natural Origin Spring-Run Chinook Salmon through the San Joaquin River Restoration Area February 1, 2021 - July 30, 2021 (0 B)
- Field Activity Advisory Wellpoint Installations February 2020 (0 B)
- Field Advisory Adult Spring-Run Chinook Salmon Holding and Spawning Habitat Study June – December 2018 (0.2 MiB)
- Field Advisory California Central Valley Steelhead Monitoring Plan (0.1 MiB)
- Field Advisory explaining the PIT Tag Study (74 KiB)
- Field Advisory Juvenile Chinook Salmon Monitoring (0.3 MiB)
- Field Advisory Spring-run Juvenile Releases 2018 (0.1 MiB)
- Field Advisory Spring-Run Juvenile Releases 2019 SJRRP (0 B)
- Field Advisory Spring-run Yearling Release (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- Field Advisory Spring-run Yearling Release Dec 2023 (0 B)
- Field Investigations in preparation for water flow monitoring activities (0.1 MiB)
- Field-Advisory-for-LiDAR 6 (0 B)
- Fish Telemetry Study for juvenile fall-run Chinook salmon (50 KiB)
- Fish Telemetry Study to track fish movement around bypasses, canals, and captured mine pit areas. (49 KiB)
- Frequently Asked Questions (34 KiB)
- Frequently Asked Questions about Soil Salinity Surveys (36 KiB)
- Frequently Asked Questions Fact Sheet (42 KiB)
- Groundwater Monitoring Well Maintenance (replacing covers) (32 KiB)
- Groundwater Seepage Monitoring Well Installation (34 KiB)
- Highway 41 (0.1 MiB)
- Hydraulic Conductivity Analysis (0.4 MiB)
- Hydraulics and Sedimentation Survey (mapping the river or channel bottoms in Reach 4B and the Eastside Bypass) (0.2 MiB)
- Installing Groundwater Monitoring Wells (32 KiB)
- Invasive Aquatic Species Sampling (68 KiB)
- Invasive Species Sampling (0.1 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.1 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (0.2 MiB)
- Inventory and Monitoring of Fish Abundance and Diversity (quarterly) (0.2 MiB)
- July 2019 - Subsidence Field Advisory (0 B)
- Juvenile Chinook Salmon Floodplain Production Study Field Advisory (83 KiB)
- Juvenile Fall-run Chinook Salmon Migration and Survival Study (59 KiB)
- Juvenile Salmon Trap and Transport Study (0.1 MiB)
- Juvenile Spring-Run Chinook Salmon Scheduled for Release (0.2 MiB)
- Kangaroo Rat Trapping in Reach 4A (63 KiB)
- Kangaroo Rat Trapping in Reach 4A (63 KiB)
- Levee and Ground Topographic Surveys by Dept. of Water Resources Contractor, Provost & Pritchard (61 KiB)
- Levee Penetration Survey (0.2 MiB)
- Levee Stability Geologic Investigations (46 KiB)
- Lost Lake (0.1 MiB)
- Maps of aerial survey areas: Friant-Kern Canal, part 1 (6.8 MiB)
- Maps of aerial survey areas: Friant-Kern Canal, part 2 (6.3 MiB)
- Maps of aerial survey areas: Madera Canal (1.1 MiB)
- March 26, 2019 Pre-construction Surveys Field Advisory (0 B)
- Mendota Pool Bypass and Reach 2B Channel Improvements Project – Test Pit Surveys for Potential Borrow Materials (53 KiB)
- Mendota Pool Sediment Sampling Surveys (0.2 MiB)
- Middle Eastside Bypass SJLEP Geotechnical Exploration (36 KiB)
- MLT Aquifer Testing SJN (0 B)
- MLT Geotechnical Surveys May 28 - June 3, 2020 (0 B)
- MLT Pre-construction Surveys Draft Field Advisory_March_19 (0.1 MiB)
- MLT Repair Field Advisory 050119 (0 B)
- Mowry Bridge Pre-Construction Activities Field Activity Advisory (0 B)
- Noise Surveys for the Mendota Pool Bypass and Reach 2B Improvements Project (0.2 MiB)
- October 1, 2020 - June 30, 2021 Rotary Screw Trap Monitoring Field Activity Advisory (0 B)
- PIT Tag Monitoring Evaluation and Site-specific Technology Assessment (86 KiB)
- Predator Assessment (0.3 MiB)
- Predator Assessment (0.8 MiB)
- Predator Assessment from River Mile 260 to River Mile 231 (map included in advisory) (0.3 MiB)
- Project and Non-Project Geologic Investigations (0.2 MiB)
- Project Vegetation Survey for Channel Hydraulic Model Development (0.3 MiB)
- Reach 1A Bathymetric Surveys (2.0 MiB)
- Reach 1B/2A_Monitoring Advisory (0.1 MiB)
- Reach 2B Geotechnical Field Advisory April 2020 (0 B)
- Reach 2B Giant Gartner Snake Survey and Trapping (4.7 MiB)
- Reach 2B Levees and Channel Improvements Geotechnical Investigations Field Advisory (0.4 MiB)
- Reach 2B Maps: Map 1 of 3 (2.1 MiB)
- Reach 2B Maps: Map 2 of 3 (2.6 MiB)
- Reach 2B Maps: Map 3 of 3 (1.2 MiB)
- Reach 3 Levee Survey Field Advisory (0 B)
- Reach 3 Maps: Map 1 of 6 (1.8 MiB)
- Reach 3 Maps: Map 2 of 6 (1.1 MiB)
- Reach 3 Maps: Map 3 of 6 (2.6 MiB)
- Reach 3 Maps: Map 4 of 6 (1.6 MiB)
- Reach 3 Maps: Map 5 of 6 (1.6 MiB)
- Reach 3 Maps: Map 6 of 6 (2.9 MiB)
- Reach 4A Topographic Surveys by Dept. of Water Resources and Provost & Pritchard (0.2 MiB)
- Reach 4B Project Baseline Vegetation Survey and Eastside and Mariposa Bypasses Vegetation Mapping (42 KiB)
- Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project Traffic Surveys (38 KiB)
- Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project Traffic Surveys (51 KiB)
- Reach 4B, Eastside, and Mariposa Bypasses Geotechnical Investigations – Standard and Cone Penetration Tests (1.1 MiB)
- Reach 4B1 Maps: Map 1 of 5 (1.0 MiB)
- Reach 4B1 Maps: Map 2 of 5 (1.4 MiB)
- Reach 4B1 Maps: Map 3 of 5 (0.3 MiB)
- Reach 4B1 Maps: Map 4 of 5 (1.9 MiB)
- Reach 4B1 Maps: Map 5 of 5 (1.2 MiB)
- Reach 5, 4B2 and Lower Eastside Bypass Topographic Surveys (0.3 MiB)
- Reach O Levee Improvements Field Activity Advisory (0 B)
- Redd & Carcass Survey, Egg Survival & Emergence Study, and Redd Incubation Environment Study (0.2 MiB)
- Redd & Carcass Survey, Egg Survival & Emergence Study, and Redd Incubation Environment Study (0.3 MiB)
- Redd and Carcass Survey and Egg Survival and Emergence Study (0.2 MiB)
- Redd and Carcass Surveys to Estimate Adult Spring-Run Chinook Salmon Spawning Success in the San Joaquin River Restoration Area (0 B)
- Resistivity Surveys (0.1 MiB)
- Revegetation Reconnaissance Surveys (0.1 MiB)
- Riparian Habitat Mapping Project (0.2 MiB)
- Rotary Screw Trap SJRRP Field Advisory November 2018 (0 B)
- Salmon Egg Survival and Emergence (0.1 MiB)
- Salmon Redd Monitoring and Carcass Recovery Surveys (0 B)
- San Joaquin River Inventory and Monitoring of Fish Abundance and Diversity (0.7 MiB)
- San Joaquin River Inventory and Monitoring of Fish Abundance and Diversity (0.5 MiB)
- San Joaquin River Juvenile Fall-run Salmon Trap and Transport Study (0.4 MiB)
- San Joaquin River Juvenile Salmon Trap and Transport Study (0.3 MiB)
- San Joaquin River Juvenile Salmon Trap Efficiency Study (0.5 MiB)
- San Joaquin River Juvenile Salmon Trap Efficiency Study (0.3 MiB)
- San Joaquin River PIT Tag Monitoring of Fall-run Juvenile Salmon Releases (0.3 MiB)
- San Joaquin River Rotary Screw Trap Study (75 KiB)
- San Joaquin River Spring-Run Chinook Salmon Monitoring Study (0.3 MiB)
- San Mateo Crossing and Floodplain areas (0.1 MiB)
- Scout Island (0.1 MiB)
- Site visits for potential seepage well locations near the SJ River (25 KiB)
- SJRRP Advisory Monitoring And Emergent Studies Oct. 2021 - April 2022 (0 B)
- SJRRP Field Advisory Spring-run Yearling Release (0.1 MiB)
- Skaggs Bridge Park Proximity (94 KiB)
- Soil Salinity Surveys in Reaches 2B, 3, and 4 (31 KiB)
- Soil Surveys, Hydraulic Conductivity and Staff Gage Surveys (0.4 MiB)
- Spring-Run Chinook Salmon Egg Survival, Emergence and Habitat Study (0 B)
- Spring-Run Chinook Salmon Monitoring Study (0.6 MiB)
- Spring-run Yearling Release December 2019 (0 B)
- Subsidence Monitoring Survey (1.0 MiB)
- Subsidence Monitoring Survey (1.0 MiB)
- Summer Biological and Cultural Resource Surveys in Reach 2B (25 KiB)
- Temperature Monitoring – installation of sensors (32 KiB)
- Terrestrial and Aquatic Invertebrate Sampling (38 KiB)
- Top-of-levee Topographic Surveys Field Advisory (0.8 MiB)
- Trap and Haul Field Advisory (0.3 MiB)
- Trap and Haul Field Advisory (0.2 MiB)
- Trap and Haul of Adult Fall-run Chinook Salmon at and above the Hills Ferry Barrier (near the confluence of the Merced River) (0.2 MiB)
- Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.4 MiB)
- Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.5 MiB)
- Update on Field Activities for Juvenile Fall-run Chinook Salmon Releases (60 KiB)
- Updated Field Advisory on the Study – November 20, 2012 (0.1 MiB)
- Updated Field Advisory on the Study – November 20, 2012 (0.1 MiB)
- Updated PIT Tag Monitoring of Fall-run Juvenile Salmon Releases (74 KiB)
- Updated San Joaquin River Rotary Screw Trap Study (72 KiB)
- Updated Trap and Transport and Streamside Spawning of Adult Fall-run Chinook Salmon (0.1 MiB)
- Vegetation Monitoring Study (70 KiB)
- Water Quality Sampling Survey (74 KiB)
- Waters of the United States Mapping and Wetland Investigations (40 KiB)
News Releases
Seepage
Water Quality
Subsidence Monitoring
Restoration Goals Meeting Archives
Surface Water
Groundwater Monitoring
Science Meeting
Habitat
Data Download
Final SJR Background Report
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 1.29.25 SJRRP Water Management Technical Feedback Meeting Agenda (0 B)
- 10 Percent Design Report 03 26 2021 (0 B)
- 20140131 SCTFG Presentation FINAL (21.9 MiB)
- 20140820 SCTFG Presentation Draft Print (14.6 MiB)
- 20141015 R2B October AgendaFINAL (1) (38 KiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA (2.5 MiB)
- 2015.0522 - SJRRP - WMTF Presentation - Final ADA(2) (2.5 MiB)
- 20150127 R2B TechMtgAgendaFINAL (45 KiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150212 SJRRP Presentation (4.4 MiB)
- 20150708 MPB-DraftDocMtgAgendaFresno LosBanos0626 (0.2 MiB)
- 20150710 MPB-DraftDocMtgAgendaSacramento0626 (45 KiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeA Map (2.6 MiB)
- 20150812 AlternativeB Map (2.6 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeC Map (2.5 MiB)
- 20150812 AlternativeD Map (2.6 MiB)
- 20150812 R4B Agenda (50 KiB)
- 20150812 SJRRP R2B Presentation1 (3.3 MiB)
- 2016-SJRRP-Science-Meeting Abstract-Form (0.2 MiB)
- 2016.02.12 MAP-Schedule-and-Objectives-for-2017-Memo (0.5 MiB)
- 20160318 SJRRP-Restoration-Allocation Final (0.5 MiB)
- 20160322 Field-Advisory-KangarooRatTrapping (63 KiB)
- 20160629 FAA SJR AdultHoldingFINAL (60 KiB)
- 2017-MAP-Pre-Proposal-Form (0.1 MiB)
- 2018 Funding Constrained Framework For Implementation (0.9 MiB)
- 20190228 SJRRP Flow Bench Evaluation FINAL (0 B)
- 20200207 SJRRP Restoration Allocation Update (0 B)
- 2022-04-emily-thomas-writeup (0 B)
- 2023 Tuel Et Al It Isnt Easy Being Green In The San Joaquin Poster (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.06.15 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2024.10.05 SJRRPWeeklyGWRept 508 (0 B)
- 2025 Channel Capacity Report (0 B)
- 2025 Channel Capacity Report Appendix A (7.4 MiB)
- 2025.01.29 WMTF Notes (0 B)
- 3 Tulare FactSheet Draft (1) (2.8 MiB)
- Agenda SCTFG 20140820 (0.2 MiB)
- Appendix A - Design Drawings Reduced (0 B)
- Appendix A Foundation For The Funding Constrained Framework-508 (0.5 MiB)
- Appendix B 2015 Framework for Implementation (5.8 MiB)
- Appendix B Analysis Of Physical Flow Characteristics-508 (6.6 MiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Construction Final 20150730 (67 KiB)
- Appendix C Federal Obligations And Expenditures Through Fiscal Year 2016 (0.2 MiB)
- Appendix C Rch2A 7-17-17 508 (2.3 MiB)
- Appendix D Project And Activity Cost Summary (0.1 MiB)
- Appendix E Mendota Pool Bypass And Reach 2B Improvements Draft Schedule-508 (44 KiB)
- April 21, 2023 - SJRRP Operations 2023 V.41q (6.8 MiB)
- Bond Reporting - Copy Draft 1 (26 KiB)
- CCR2017 Final-draft Appendix-B 508 (15.0 MiB)
- CCR2019 Final Appendix A (0 B)
- Channel Capacity Report 2018 Appendix A (0.2 MiB)
- Channel Capacity Report 2018- Appendix C Reach 2A (2.3 MiB)
- Channel Capacity Report 2018--Appendix B Channel Capacity Update Reach2A 2B (1.6 MiB)
- Creek Fire Bass Lake Clovis Fire Dept. (0.2 MiB)
- Cropped Refuge Pano (2.1 MiB)
- CV SMP Poster 2012 23 Final 042823 (0 B)
- December 2023 ArcGIS Data (0.1 MiB)
- DRAFT DWR BOR Data Summary 070314 (3.3 MiB)
- DRAFT SCTFG Agenda 20140131UPDATE (0.1 MiB)
- DWR SJRRP TFG 082014f (1.3 MiB)
- Effects of a Riparian Forest on Water Temperatures in the Restoration Area 2014 (0 B)
- Emergence Poster 2023 SJRRP Meeting (0 B)
- EndofSJR 20160309 (0.2 MiB)
- February 2, 2025 (0 B)
- Field Advisory Spring-run Yearling Release Aug 2023 (0 B)
- FINAL SCTFG Meeting Summary 082014 (0.2 MiB)
- Framework Map - Large (1.7 MiB)
- Friant NASA ASO Poster (0.3 MiB)
- Fyke Net Install (2.0 MiB)
- How Is Airborne Snow Observatory Data Being Utilized V6 (0.8 MiB)
- Jan2025 WMTF Meeting (0 B)
- June 23, 2023 - SJRRP Operations 2023v.41r (5.3 MiB)
- Juvenile Spring-Run Chinook Salmon Production, Survival, and Emigration in the San Joaquin River Restoration Area 2020–21 Monitoring and Analysis Report (0 B)
- May 26, 2023 - SJRRP Operations 2023 (5.2 MiB)
- MCFS DRAFT May27 Meeting Summary Final (52 KiB)
- ML SJRRP Presentation (0 B)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- MP-18-006 SJRRP Eastside Bypass EA-IS Extended Comment Period (0.2 MiB)
- Reach1A UpdatedModel Gdb (61.9 MiB)
- Refuge Weir Pano II (0.7 MiB)
- Reynaud AreMacrophytesPositively (0 B)
- Riparian Microclimate Study 2014 (0 B)
- River Rock Mitigation Poster - Final (0 B)
- San Joaquin 2017 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Joaquin Veg Monitoring 2019 Final Report (0 B)
- San Slough Control Structure II (0.7 MiB)
- SCARF Rendering (0.1 MiB)
- SCTFG 20231208 Agenda (0 B)
- SCTFG Meeting Summary 20140131 (0.2 MiB)
- Sherman Et Al SJRRP2023 Poster (0 B)
- SJRR Org Chart Color FINAL 4-30-07 (0.2 MiB)
- SJRRP 2020 Virtual Science Meeting Agenda (0 B)
- SJRRP 2023Mtg Agenda (0 B)
- SJRRP 2023Mtg Agenda FINAL (0 B)
- SJRRP AnnualReport 2019-2020 508 (0 B)
- SJRRP ATH Poster Draft ZS 42823 (0 B)
- SJRRP Brood Year 2014 Fishery Implementation Plan (0.6 MiB)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Environmental Achievement Award Final 508 (0 B)
- SJRRP Fish Habitat Study - Final 2012 (1) (2.9 MiB)
- SJRRP IPAR Final 062708 (1.9 MiB)
- SJRRP Operations Apr 11 2024 (6.2 MiB)
- SJRRP Operations Aug 10 2023 (6.4 MiB)
- SJRRP Operations Aug 9 2024 (5.9 MiB)
- SJRRP Operations Dec 16 2024 (8.0 MiB)
- SJRRP Operations Dec 20 2024 (8.0 MiB)
- SJRRP Operations Dec 27 2024 (8.0 MiB)
- SJRRP Operations Dec 31 2023 (6.6 MiB)
- SJRRP Operations Dec 6 2024 (8.0 MiB)
- SJRRP Operations Feb 14 2025 (8.0 MiB)
- SJRRP Operations Feb 21 2025 (8.0 MiB)
- SJRRP Operations Feb 28 2025 (7.7 MiB)
- SJRRP Operations Feb 7 2025 (8.0 MiB)
- SJRRP Operations Jan 10 2025 (8.0 MiB)
- SJRRP Operations Jan 17 2025 (8.0 MiB)
- SJRRP Operations Jan 24 2025 (8.0 MiB)
- SJRRP Operations Jan 3 2025 (8.0 MiB)
- SJRRP Operations Jan 31 2025 (8.0 MiB)
- SJRRP Operations July 12 2024 (7.2 MiB)
- SJRRP Operations Jun 21 2024 (7.2 MiB)
- SJRRP Operations Mar 14 2025 (7.8 MiB)
- SJRRP Operations Mar 7 2025 (7.8 MiB)
- SJRRP Operations May 17 2024 (6.3 MiB)
- SJRRP Operations Nov 15 2024 (7.9 MiB)
- SJRRP Operations Nov 17 2023 (6.5 MiB)
- SJRRP Operations Nov 2 2024 (7.9 MiB)
- SJRRP Operations Nov 22 2024 (7.9 MiB)
- SJRRP Operations Nov 29 2024 (8.0 MiB)
- SJRRP Operations Nov 8 2024 (7.9 MiB)
- SJRRP Operations Oct 11 2024 (7.9 MiB)
- SJRRP Operations Oct 20 2023 (6.5 MiB)
- SJRRP Operations Sep 6 2024 (7.8 MiB)
- SJRRP Operations Sept 18 2023 (6.4 MiB)
- SJRRP PIP 4-27-07 Final (0.3 MiB)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP ScienceMtng In-house-Program Pages (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report - Week Ending 11-16-19 508v.5 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRP Weekly Groundwater Report Template 112319 508 (0 B)
- SJRRPDraftPEISRLibrarys4web (22 KiB)
- SJRRPExpensesObligations FY2007 2011 20120221 (1.0 MiB)
- SJRRPWeeklyGWRept 01 03 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 06 25 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 06 27 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 07 09 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 07 28 2018 (0 B)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 09 23 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 10 29 2016 (0.2 MiB)
- SJRRPWeeklyGWRept 11 11 2017 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015 (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(2) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(3) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(4) (0.2 MiB)
- SJRRPWeeklyGWRept 12 19 2015(5) (0.2 MiB)
- SJRTemperature Model 20070510 Final (2.0 MiB)
- SMP Appendix C Attachment September 2014 (0 B)
- SteelheadMonitoringPlanSJRR2012July (1.1 MiB)
- StockSelectionStrategy2010Nov (1.7 MiB)
- Striped Bass In The San Joaquin Final 2024 (0 B)
- Striped Bass Presentation Final (0 B)
- Test (0.1 MiB)
- Third Parties Mou 022607 (0.2 MiB)
- UpdatedAppendixB 20150625 (5.9 MiB)
- Water Safety (16 KiB)
- WQ Report SMP 201212 (2.7 MiB)
- WQ Report SMP 201305 (2.7 MiB)
- WQ Report SMP 201512 (2.7 MiB)
- WQ Report SMP 201703 (1.0 MiB)
- WQ Report SMP 201805 (0 B)
- WQ SMP Tables and Data - Summary (0.3 MiB)
