Program resumes Restoration Flows to protect burgeoning Threatened salmon population The San Joaquin River Restoration Program Restoration Administrator has adjusted the schedule of Restoration Flows on the San Joaquin River. On December 16, Friant Dam will increase releases to meet a target of 415 cfs at Gravelly Ford (increasing from 365 cfs). This flow rate […]
San Joaquin River Restoration Program Postpones Restart of Restoration Flows This notice serves to inform the public that the Restoration Administrator, a court-appointed position selected by the Friant Defendants and Plaintiffs in the Settlement, has postponed the resumption of Restoration Flows. Restoration Flows will resume no earlier than October 1. Restoration Flows were ceased on […]
On April 1, Reclamation will start deliveries to the San Joaquin River Exchange Contractors from Friant Dam. Normally, Exchange Contractor water supply is met from north-of-Delta water delivered through the Delta-Mendota Canal. However, because this is a “Shasta Critical” water year, Exchange Contractors are scheduled to receive 75% of their normal allocation, a total of […]
Spring-run Chinook Return to San Joaquin River Despite Low Water Year 2020 Brings Generational Variety, New Information If there’s one certainty in these uncertain times, it’s that nature is resilient, and one needn’t look further than the San Joaquin River as an example. For a second year in a row, and for only the second […]
The following are the Funding Constrained Framework documents: Funding Constrained Framework for Implementation Appendix A: Foundation for the Funding Constrained Framework for Implementation (summary) Appendix B: Analysis of Physical Flow Characteristics Supportive of Chinook Salmon to Inform Channel Capacity Selection in the Funding Constrained Framework Appendix C: Federal Obligations and Expenditures Through […]
Note: Some reports, although portioned into manageable sizes are still quite large and may take some time to download – depending on your download speed.
Documents/Reports – Pre-Settlement Note: Some reports, although portioned into manageable sizes are still quite large and may take some time to download – depending on your download speed. Expert Reports
Documents/Reports – Settlement Note: Some reports, although portioned into manageable sizes are still quite large and may take some time to download – depending on your download speed.
Documents/Reports – Restoration Administrator The Restoration Administrator (RA), selected jointly by the NRDC and FWA, provides recommendations to the Secretary, in consultation with the Technical Advisory Committee, regarding specific elements of the Settlement and certain issues related to the SJRRP Restoration Goal. Available Documents Note: Some reports, although portioned into manageable sizes are still quite […]
Note: Some reports, although portioned into manageable sizes are still quite large and may take some time to download – depending on your download speed.