February 15, 2016 – increase to 80 cfs past Gravelly Ford, 20160211-SJRRP-Flow-Bench-Evaluation.pdf (2.0 MiB)
File Category: Flow Schedule
October 28, 2013 – increase to 1050 cfs
October 28, 2013 – increase to 1050 cfs, FlowBenchEval20131028.pdf (1.7 MiB)
April 12, 2013 – increase to 1060 cfs
April 12, 2013 – increase to 1060 cfs, FlowBenchEval20130412.pdf (1.6 MiB)
November 1, 2012 – increase to 750 cfs
November 1, 2012 – increase to 750 cfs, FlowBenchEval20121101.pdf (0.3 MiB)
May 7, 2012 – increase to 1100 cfs
May 7, 2012 – increase to 1100 cfs, FlowBenchEval20120507.pdf (0.4 MiB)
May 2, 2012 – increase to 1000 cfs
May 2, 2012 – increase to 1000 cfs, FlowBenchEval20120502.pdf (0.5 MiB)
Measured Ground Lateral Field Groundwater Surface Gradient Depth Field Depth in Well
Measured Ground Lateral Field Groundwater Surface Gradient Depth Field Depth in Well, FlowBenchEval20120501.pdf (0.4 MiB)
April 23, 2012 – increase to 700 cfs
April 23, 2012 – increase to 700 cfs, FlowBenchEval20120423.pdf (0.4 MiB)
April 17, 2012 – increase to 500 cfs from Friant Dam
April 17, 2012 – increase to 500 cfs from Friant Dam, FlowBenchEval20120417.pdf (0.3 MiB)
January 13, 2012 – increase to 350 cfs from Friant Dam on 1/17/2012
January 13, 2012 – increase to 350 cfs from Friant Dam on 1/17/2012, FlowBenchEval20120113.pdf (0.4 MiB)