Skip to content

MENUMENU
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
  • Projects
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Fish Passage Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach

File Category: Restoration Goals Meeting Archives

May 17, 2012: Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project

May 17, 2012: Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and Structural Improvements Project, 20120517RGTFGMtgR4BProjPres.pdf (3.2 MiB)

May 17, 2012: Mendota Pool Bypass and Reach 2B Channel Improvements Project

May 17, 2012: Mendota Pool Bypass and Reach 2B Channel Improvements Project, 20120517RGTFGMtgR2BProjPres.pdf (1.0 MiB)

May 17, 2012: 2012 Meeting Schedule

May 17, 2012: 2012 Meeting Schedule, SJRRP_RGTFG_2012MtgSchd20120514.pdf (0.8 MiB)

May 17, 2012: Field Activities Tracker

May 17, 2012: Field Activities Tracker, 20120516SJRRPFieldActivityTracker.pdf (63 KiB)

May 17, 2012: Meeting Summary

May 17, 2012: Meeting Summary, 20120517_RGTFG_revMtgSummary.pdf (0.1 MiB)

July 19, 2012: Agenda

July 19, 2012: Agenda, 20120719_RGTFG_July2012Agenda.pdf (0.1 MiB)

July 19, 2012: Field Activity Tracker

July 19, 2012: Field Activity Tracker, 20120719_RGTF_handout_FieldActivityTracker.pdf (89 KiB)

July 19, 2012: 2B / 4B Process

July 19, 2012: 2B / 4B Process, 20120719_RGTF_handout_2B_4B_process.pdf (0.1 MiB)

July 19, 2012: Floodplain Introduction

July 19, 2012: Floodplain Introduction, 20120719_2_RTF-Floodplain-Intro.pdf (0.1 MiB)

July 19, 2012: Introduction

July 19, 2012: Introduction, 20120719_1_RGTF_Intro.pdf (97 KiB)

Posts navigation

Older posts
Newer posts

Sibling Pages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome

Subpages

  • Arroyo Canal and Sack Dam Documents
  • Data Table
  • Downloads
  • Fish
  • Forecasting
  • Friant-Kern Canal Restoration Project Documents
  • Get Involved
  • Gravel Pit Isolation Documents
  • Groundwater Banking Projects Documents
  • Interim Flows Photos
  • Madera Canal Capacity Restoration Project Documents
  • Monitoring Data
  • Projects
  • Reach 2B and Mendota Pool Bypass Documents
  • Reach 4B and Eastside Bypass Documents
  • Recapture and Recirculation Documents
  • Redd and Carcass Surveys
  • Restoration Flows
  • Reverse Flow Facilities Documents
  • San Joaquin River Restoration Program Map
  • Science
  • Table example page
  • Welcome
  • Home
  • Projects
  • Science
  • Flows
  • Fish
  • Get Involved
Copyright © 2025 San Joaquin River Restoration Program. All Rights Reserved.
Contact Us
Top
San Joaquin River Restoration Program
  • Home
    • Background and History
    • Overview Map
    • Program Organization
    • Program Documents
    • Back
  • Projects
    • Restoration
      • Reach 2B and Mendota Pool Bypass
      • Reach 4B and Eastside Bypass
      • Arroyo Canal Fish Screen and Sack Dam Fish Passage Project
      • Gravel Pit Isolation
      • Reach O Levee Improvements
      • Back
    • Water Management
      • Friant-Kern Canal Restoration Project
      • Madera Canal Capacity Restoration Project
      • Reverse Flow Facilities
      • Recapture and Recirculation
      • Groundwater Banking Projects
      • Back
    • Back
  • Science
    • Study Plans
    • Reports
    • Data Download
    • Science Meeting
    • Subsidence Monitoring
    • Habitat
    • Back
  • Flows
    • Flow Conditions
    • Surface Water
    • Groundwater Monitoring
    • Water Quality
    • Unreleased Restoration Flows
    • RA Recommendations
    • Seepage Projects
    • Levee Stability / Channel Capacity
    • Back
  • Fish
    • Reintroduction Activities
    • Monitoring Activities
    • Conservation Facility
    • Back
  • Get Involved
    • Recent Stories
    • Newsroom
    • Involvement Opportunities
    • Field Advisories
    • Keep Me Informed
    • Related Links
    • General Outreach
    • Back